Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 22, 2025 at 8:00 PM
Updated October 21, 2025
Site work and paving for a civil project in Birmingham, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The Scope of Work Includes the Replacement of Approximately 1,692 Linear Feet of 18-inch Sanitary Sewer Pipe With 21-inch Sewer Pipe, 6,014 Linear Feet of 15-inch Sanitary Sewer Pipe With 18-inch Sewer Pipe, 2,991 Linear Feet of 12-inch Sanitary Sewer Pipe With 15-inch Sewer Pipe, 152 Linear Feet of 12-inch Sanitary Sewer Pipe, 157 Linear Feet of 10-inch Sanitary Sewer Pipe, 627 Linear Feet of 8-inch Sanitary Sewer Pipe, 100 Linear Feet of 6- inch Sanitary Sewer Pipe and 80 Manholes; the Reconnection of Service Laterals; Asphalt Paving; Stream Stabilization; and Restoration Work. No Bid Proposal Shall Be Accepted After the Time Stated for Receiving Bid Proposals in This Notice. A Form Containing the Contractor's Name and Address of the Firm and the Contractor's Alabama License Number With the Date of Expiration is Required With the Submission of the Bid. These Requirements Shall Not Be Waived. The Contractor is Hereby Advised That Time is of the Essence on This Project. The Contract Time for This Project is Five Hundred and Forty-five (545) Consecutive Calendar Days. The First 180 Days Will Be an Administrative Period Followed by a 365-day Construction Period From the Effective Date of the Written Notice to Proceed to Achieve Final Acceptance. If Mutually Agreed Upon Between the Owner and Contractor, the Construction Period May Commence Prior to the End of the Administrative Period. Upon Such Agreement the Contract End Date Will Be Modified Based on the Date of Termination of the Administrative Period. Liquidated Damages Will Be Assessed if This Time Limit is Exceeded. The Contractor May Apply for an Extension of Time in Accordance With the Provisions of the Contract; However, Such an Extension Must Be Approved Prior to the Contract Completion Date to Avoid the Imposition of Liquidated Damages. Questions Concerning Meaning or Intent of Bidding Documents Shall Be Submitted to Tad Powell, Pe, Senior Associate, Hazen and Sawyer, at Email Tpowell@hazenandsawyer.com No Later Than 5:00 P.m. Local Time on May 14, 2025. All Questions Must Be in Writing on Bidder's Company's Letterhead or Email. The Attention of All Bidders is Called to the Provisions of the State Law Governing General Contractors, as Set Forth in Alabama Code Sections 34-8-1 Through Section 34-8-28 (1975), as Amended, Chapter 4, Section 65 to 82 (Inclusive) of Title 46 of the Code of Alabama of 1940, as Amended; and Bidders Shall Be Governed by Said Law Insofar as It is Applicable. The Above Mentioned Provisions of the Code Make It Illegal for the Owner to Consider a Bid Proposal From Anyone Who is Not Properly Licensed Under Such Code Provisions. The Attention of Bidders is Called to the Provisions of Alabama Code Section 39-2-14 (1975) as Amended, Requiring a Nonresident Contractor to Register With the Department of Revenue Prior to Engaging in the Performance of a Contract in the State of Alabama. The Attention of Bidders is Called to the Provisions of Alabama Code Section 39-3-5 (1975) as Amended, Regarding Preference to Resident Contractors. The Attention of Bidders is Called to the Provisions of Alabama Act 2016-312 as Amended, Regarding Not Engaging in the Boycott of a Person or Entity Based in or Doing Business With a Jurisdiction With Which This State Enjoys Open Trade. The Excavation Portion of This Project is Classified as a Class "B" Sewer Line Project. All Prospective Bidders Must Be Pre-qualified With the Jefferson County Environmental Services Department to Bid Class "B" Sewer Line Projects in Order to Bid on This Project. To Pre-qualify With the Department and to Construct Class "B" Sewer Line Projects, Each Prospective Bidder Must Furnish Written Evidence of Competency and Evidence of Financial Responsibility to the County. Accordingly, the County Will Not Accept Pre-qualification Applications After May 2, 2025. Bid Proposal Forms Will Not Be Issued to Prospective Bidders Who Do Not Pre-qualify. Contractors Are Encouraged to Contact the Jefferson County Environmental Services Department, 716 Richard Arrington Jr. Boulevard North, Suite A300, Birmingham, Alabama, (205)325-5496 in Advance of the Deadline to Determine if the Contractor is Pre-qualified to Construct Class "B" Sewer Line Projects, or for Other Information Regarding the Requirements for Pre-qualification. Pre-Qualification: Yes
Award
Roads / Highways
$13,649,386.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2025
August 11, 2025
To Be Determined, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Apr 17 2025
Birmingham, AL
Bid Date: May 14 2025
Birmingham, AL
Bid Date: May 15 2025
Birmingham, AL
Bid Date: Apr 29 2025
Birmingham, AL
Bid Date: May 08 2025
Birmingham, AL
Bid Date: May 19 2025
Birmingham, AL
Bid Date: Jun 24 2025
Birmingham, AL
--
Birmingham, AL
Bid Date: Apr 15 2025
Birmingham, AL
Bid Date: Apr 15 2025
Birmingham, AL
Bid Date: May 07 2025
Birmingham, AL
Bid Date: May 06 2025
Birmingham, AL
Bid Date: Jun 12 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
