Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 27, 2025 at 8:00 PM
Updated May 28, 2025
Site work for a civil project in Devlin, Ontario. Completed plans call for site work for a bridge / tunnel; and water / sewer project.
The Tender includes: - Clearing & Grubbing, Removal of Trees and Vegetation along Proposed Subdivision Roadway and Infrastructure Right-of-Ways. - Supply & Placement of 150 mm Dia. DR 18 PVC Watermain. - Supply & Installation of 150 mm Dia. Isolation Valves. - Supply & Installation of 19 mm Dia. HDPE Water Services. - Supply & Installation of Curb Stops and Fire Hydrant Assemblies. - Upgrades to Existing Sewage Pumping Stations, SPS-1 & SPS-2. - Supply & Installation of Two (2) 40 kW Stand-by Power Generator Units. - Supply & Installation of Process Mechanical & Electrical Equipment. - Supply & Placement of 150 mm Dia. HDPE DR11 Sewage Forcemain to Ex. Lagoon. - Supply & Installation of Forcemain Air Release Chambers. - Supply & Placement of 200 mm Dia. PVC DR35 Gravity Sanitary Sewers. - Supply & Installation of 125 mm Dia. Sanitary Service Laterals. - Supply & Placement of Precast Concrete Manhole Structures. - Proposed Subdivision Road Extension (Approximately 900 Lineal metres). - Lot Grading, Lot Driveways, and Ditching along Subdivision Road Extension. - Installation of Driveway and Roadway Cross Culverts. - Rock Blasting & Excavation. - Site Restoration. Each Tender submission must be accompanied by a certified cheque or bid bond to be retained by the Consulting Engineer for an amount of at least 10 percent (10%) of the total Tendered price made payable to Naicatchewenin First Nation. This contract is subject to the approval of Naicatchewenin First Nation. The lowest or any Tender will not necessarily be accepted. The Contractor shall complete all works to the point of substantial completion described herein and on the Contract Drawings. It is anticipated that Contract Award will occur in May 2025. Therefore, it will be understood that the project working time allotted of 24 weeks will commence following mobilization of equipment and manpower to site by the Contractor based on a start date no later than June 15, 2025. The 24-week duration does not account for delivery time and finalized installation of the provisional propane generators which could be 24-35 weeks. Substantial completion shall be performed by November 2025. The Engineer and the Owner reserve the right to reject any or all Tenders and to waive formalities, as the interests of the Owner may required, without stating reasons thereto. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline: 2025/05/12 05:00:00 PM EDT
Post-Bid
Water / Sewer
$1,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
