BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2025 at 8:00 PM

Updated July 29, 2025

Site work and paving for a mixed-use development in Milford, Pennsylvania. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Ann Street Park Phase 1 Improvements. The work includes but is not limited to all labor, materials, tools and equipment, oversight, permits, and inspections required to remove existing playground equipment, site furnishings, and all items not conducive to final design and construct or install new playground equipment, underdrain and electrical utilities, safety surface and edging, stone retaining wall, concrete walkways, asphalt paving, fencing, landscaping, and site furnishings. Bids must be accompanied by a bid bond with a corporate surety authorized to do business in Pennsylvania, in accordance with the project specifications in the amount of 10% of the total bid amount. A Performance and Payment Bond in the amount of 100% of the contract shall be furnished by the successful bidder as detailed in the Instructions to Bidders. Prevailing Wage Rates shall apply. Questions may be submitted through electronically on or before 3:00 PM on Monday, April 28, 2025. Responses will be provided via electronically to all registered parties. Milford Borough reserves the right to accept or reject any or all bids or portions or to waive any informalities in bidding and to withhold award for a period of sixty days WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. All labor, materials, tools and equipment, oversight, permits, and inspections required to remove existing playground equipment, site furnishings, and all items not conducive to final design and construct or install new playground equipment, underdrain and electrical utilities, safety surface and concrete edging, stone retaining wall, concrete walkways, asphalt paving, fencing, landscaping, and site furnishings. B. Type of Contract: 1. Project will be constructed under a single prime contract.

Award

Playgrounds / Parks / Athletic Fields

$246,091.00

Public - City

Paving, Site Work

10

16

7

3

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
763
Active Projects
409
Bidding Soon
6,290
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2025

June 9, 2025

Project location map

W Ann St & 5th St, Milford, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.