BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Site work and outdoor lighting for a playground / park / athletic field in Simi Valley, California. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

**As of May 12, 2025, the project was awarded to Venco Electric, with an awarded amount of $1,085,000.** **As of MAY 6, 2025 , project has not been awarded yet, The Rancho Simi Recreation and Park District’s Board of Directors will consider an award of contract for this project at their upcoming May 7, 2025 Board of Directors meeting.".** No bid will be considered unless it is made on a proposal form furnished by the District. Each bid must be accompanied by cash, a certified cashier's check, or a bidder's bond and made payable to the Rancho Simi Recreation and Park District for an amount equal to at least ten (10) percent of the amount bid, such guarantee to be forfeited should the bidder to whom the contract is awarded fail to furnish good and sufficient bond for the faithful performance thereof and for the payment of labor and material costs in accordance with the requirements of the Contract Documents, and by the proposal requirements. In the event that surety bond is submitted in lieu of the foregoing, it shall be subject to the conditions that the surety and the form of the bond be approved by the District The District reserves the right to reject any or all bids and the right to waive minor irregularities or informalities in any bonds or in the contract proposal. The District reserves the right to award bids up to a period of forty-five (45) days after the date of bid opening. The awarded bidder/contractor for this project must possess a current and valid General Engineering (A) Contractors License issued by the State of California. Every original Contractor awarded a Contract shall file a Payment and Performance Bond with the District in the form approved by the District.

Award

Playgrounds / Parks / Athletic Fields

$1,085,000.00

Public - City

Outdoor Lighting, Site Work

13

13

4

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
518
Active Projects
240
Bidding Soon
2,833
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 29, 2025

Project location map

1765 Royal Ave, Simi Valley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.