BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Renovation of a municipal facility in Bourne, Massachusetts. Completed plans call for the renovation of a municipal facility.

Harrington Hall Tug Simulator & 01 Admin Suite Renovations -Sub Bid The scope of the project is to perform selective renovations to the 1st and 3rd floor of Harrington Hall. On the third floor, one existing room that is currently unoccupied, will be converted to a Tug Simulator Room, including power, AV upgrades, room reconfiguration and air distribution. On the first floor, the existing Administrative Suite will be upgraded with new finishes and furniture. The renovated spaces will provide new acoustic ceiling tile, new lighting, new wall finishes, new flooring and ceiling diffusers. The work is estimated to cost $402,933.00 Bids are subject to M.G.L. c.149 44A-J & to minimum wage rates as required by M.G.L. c. l49 26 to 27H inclusive. General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work -- . Filed Sub-Bidders and General bidders on this project must be DCAMM Certified Question Deadline 04/25/2025 . All related questions should be sent to ryans@perrydean.com, michaelc@perrydean.com and procurement@maritime.ed Each Bid must be accompanied by a bid security consisting of a BID BOND, or, CERTIFIED, TREASURER'S OR CASHIER'S CHECK issued by a responsible bank or trust company and made payable to the Massachusetts Maritime Academy in the amount of 5% of the Bid price. The minimum wage rate requirements for this Contract are listed as part of the bid document Pursuant to M.G.L. c. 30, 39S(a) (2) all employees to be employed on the project must have successfully completed a course in construction safety and health approved by OSHA and of at least 10 hours in duration The project expected start date is May 15th, 2025, with a substantial completion date of August 8th, 2025 and the final completion date no later than August 29th, 2025. Custom Bid Tabulation Project Rockwell Roofing, Inc. Roofing and Flashing $49,000.0 Harold Brothers Mechanical Heating / Ventilating / AirConditioning (HVAC) $186,700 EM-V Electrical Contractors, Inc. Electrical Work $212,550.00

Award

Municipal

$815,100.00

Public - State/Provincial

Renovation

59

21

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
440
Active Projects
175
Bidding Soon
3,240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2025

May 15, 2025

Project location map

101 Academy Dr, Bourne, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.