BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 24, 2025 at 8:00 PM

Updated June 25, 2025

Site work for a water / sewer project in Santa Clarita, California. Completed plans call for site work for a water / sewer project.

That for and in consideration of the covenants and agreements hereinafter contained on the part of the AGENCY, and the sums of money hereinafter designated to be paid to the CONTRACTOR by the AGENCY in the manner and form as hereinafter in attached specifications provided, the CONTRACTOR hereby covenants and agrees to and with the AGENCY, to provide all labor, tools, appliances, equipment, plant and transportation, and any and all other expenses necessary or incidental to the performance of certain work hereinafter specified, and to provide, construct, and complete all of the Work required in strict compliance with the Contract Documents as specified below in section 4 for the AMI Meter Replacement Program all as more particularly and in detail set forth in those certain plans and specifications filed in the office of the AGENCY, and identified by the signatures of the parties to this Agreement. License Requirements C-36 Plumbing Contractor California Code of Regulations Title 16 Division B, Article3 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 05/01/2025 5:00 PM (PDT)

Award

Water / Sewer

$540,630.00

Public - City

Site Work

4

15

2

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
88
Bidding Soon
1,918
All Active Projects
739
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

July 14, 2025

img_map_placeholder

Multiple Locations, Santa Clarita, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.