BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2025 at 8:00 PM

Updated July 1, 2025

Demolition, site work and renovation of a water / sewer project in Maple Falls, Washington. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The project shall include demolition of existing comminutor; installation of new comminutor and associated electrical, controls, and accessories; demolition of existing effluent pump station and accessories; installation of new submersible pumps in the existing effluent wet well; construction of a new flow meter vault; bypass pumping; installation of new magnetic flow meter, connection to existing force main, and installation of all interconnecting piping and valves; replacement of existing effluent wet well base plate with new access hatches; installation of new electrical controls for effluent pumps and flow meter; installation of new data collection equipment; site work, and all related work for a complete and operable system as shown on the Plans and in the Specifications. The Work shall be substantially complete within 130 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the District Manager, District Office, Maple Falls, Washington. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashier's check, or Proposal bond payable to the "Whatcom County Water District 13" and in an amount of not less than five percent (5%) of the total Proposal amount. Bidders are encouraged to register in order to receive automatic email notification of future addenda and to be placed on the Bidders List. For assistance, please call (206) 284-0860. Contract questions shall be directed only to the office of the Project Engineer. No unauthorized visits or unscheduled visits will be allowed. Financing of the Project has been provided by Whatcom County Water District 13, Washington. The Whatcom County Water District 13 expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal.

Bid Results

Water / Sewer

$351,914.00

Public - County

Demolition, Renovation, Site Work

30

24

4

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
27
Bidding Soon
2,457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 5, 2025

Project location map

To Be Determined, Maple Falls, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.