BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2025 at 8:00 PM

Updated November 7, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Red Rock Township, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Site Directions: SAP 50-599-179- on T-288 (780th Ave), 1.8 Miles north of CSAH 11 in Leroy TWP. SAP 50-599-179- Bridge Removal, Construct 1 Line 10' X 7' RCBC and 1 line 12' X 6' RCBC with end sections, Grading, Aggregate Surfacing, Riprap, Erosion Control, Turf Establishment, and Appurtenant Construction. Bridge Removal, Bridge Construction, Excavation, Grading, Culvert Removal, Culvert Construction, Aggregate Surfacing, Riprap, Erosion Control, and Turf Establishment . The Project name is shown above. The Project consists ofthe removal ofBridge Nos. L5129, and its replacement with new Bridge No. 50K.89, and appurtenant construction. Construction Start Date: August 18, 2025 Estimated Completion Date: August 29, 2025

Award

Bridges / Tunnels

$207,409.00

Public - County

Demolition, New Construction, Paving, Site Work

18

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
46
Bidding Soon
588
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 9, 2025

Project location map

228th St, Red Rock Township, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.