Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 23, 2025 at 8:00 PM
Updated June 24, 2025
Site work for a water / sewer project in Auburn, California. Completed plans call for site work for a water / sewer project.
The date and time shall be extended by no less than 72 hours if the officer, department, or Project Manager issues any material changes, additions, or deletions to the invitation later than 72 hours prior to the bid closing. Any bids received after the time specified above or any extension due to material changes shall be returned unopened. Project Name: 2025 SEWER IMPROVEMENTS PROJECT Project Description: The project to be constructed shall consist of the CIPP lining of existing sewer mains, manhole rehabilitation, and lateral connection replacement where needed. Opinion of Probable Cost: $1,077,000 The AGENCY reserves the right to reject any and all bids. If you have any questions, please contact James Taber 530-823-4211 ext. 111, jtaber@auburn.ca.gov MOBILIZATION & DEMOBILIZATION: Includes administrative portions of the work associated with mobilizing, but not limited to, construction schedule, safety plan, public notifications, bonds, insurance, permits, establishment of a contractor's staging area and move in of related equipment, tools, supplies and personnel. Includes cleanup of staging area, removal of all contractor's equipment, materials and supplies from the project site, and restoration of the site as specified in Specification 02276 Section 3.04. See Specification 01200 Sections 1.04 C and 1.05 for requirements. Payment Method- Lump Sum Payment Basis- Schedule of Values Submittal Date- Two weeks before first payment request 2. TRAFFIC CONTROL: Traffic control is required for all areas of the project impacting pedestrian and/or vehicular traffic within the public street right of way. See requirements listed in Specification 01020. Payment Method- Lump Sum Payment Basis- Schedule of Values Submittal Date- Two weeks before first payment request 3. TEMPORARY SEWER BYPASS: Includes planning, furnishing, and installation of all temporary piping and equipment necessary to maintain existing sewer services in operation. Sewer service may be shutdown, for a duration of 6 hours or less, to facilitate sewer lateral replacement where needed. See Specification 01520. Payment Method- Lump Sum Payment Basis- Schedule of Values Submittal Date- Two weeks before first payment request 4. PIPE CLEANING, CCTV, AND CIPP LINING OF 6-INCH MAINS: Includes requirements as listed in Specification 02500 and as required in the Contract Drawings. Payment Method- Unit Cost Payment Basis- Schedule of Values Submittal Date- Two weeks before first payment request 5. PIPE CLEANING, CCTV, AND CIPP LINING OF 8-INCH MAINS: Includes requirements as listed in Specification 02500 and as required in the Contract Drawings. Payment Method- Unit Cost Payment Basis- Schedule of Values Approved for use on 10/16/2023 17 Submittal Date- Two weeks before first payment request 6. MANHOLE REHABILITATION: Includes requirements as listed in Specification 02900 and as required in the Contract Drawings. Payment Method- Unit Cost Payment Basis- Schedule of Values Submittal Date- Two weeks before first payment request 7. SEWER LATERAL REPLACEMENT ALLOWANCE: Includes requirements as listed in Specification 02530 and as required in the Contract Drawings. No payment shall be made for lateral replacement unless authorized by the Engineer. Payment Method- Unit Cost Payment Basis- Schedule of Values Submittal Date- Two weeks before first payment request 8. TEAMTRACK ROAD SEWER (M-346) CIPP LINNING: Includes requirements as listed in Specifications 02500, 02900, and as required in the Contract Drawings. This item is not to be included in the base bid total estimate. No payment shall be made unless authorized by the Engineer. Payment Method- Unit Cost Payment Basis- Schedule of Values Submittal Date- Two weeks before first payment request
Award
Water / Sewer
$961,450.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2025
July 21, 2025
Multiple Locations, Auburn, CA
Related To This Project
Auburn, CA
Bid Date: May 14 2025
Auburn, CA
Bid Date: May 13 2025
Auburn, CA
Bid Date: May 20 2025
Auburn, CA
Bid Date: May 13 2025
Auburn, CA
Bid Date: May 12 2025
Auburn, CA
Bid Date: May 20 2025
Auburn, CA
--
Auburn, CA
Bid Date: Jun 04 2025
Auburn, CA
Bid Date: Jun 18 2019
Auburn, CA
Bid Date: May 16 2025
Auburn, CA
--
Auburn, CA
Bid Date: Mar 26 2025
Auburn, CA
Bid Date: Dec 01 2025
Auburn, CA
Bid Date: Dec 02 2025
Auburn, CA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
