Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 23, 2025 at 8:00 PM
Updated June 24, 2025
Site work and paving for a transportation facility in Ball Ground, Georgia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
**As of June 23rd,2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The work generally consists of pavement rehabilitation of a parallel taxiway, hangar area and terminal apron. Question Deadline 05/13/2025 at 5:00 PM ET Bidders are required to submit all questions in writing to arostin@leadedgedesign.com. Bid security in the form of a bid bond equal to 5% of the total bid amount is required. In lieu of the bid bond, a cashier's check, certified check, or cash may be accepted. Contract bonds (Performance and Labor & Material Payment) will be required at contract execution, each in the amount of 100% of the Contract amount, provided by sureties authorized to conduct business in the State of Georgia. No bid may be withdrawn after closing time for the receipt of proposals for a period of one hundred twenty (120) calendar days unless that bid is withdrawn per state law. A Notice-ofAward for the Contract will be issued once a successful bidder has been determined and funding has been secured. All Bidders must be licensed as required by the State of Georgia. Bidders are advised that the date, time, and location for submitting proposals or opening bids may be modified by Addendum, which must be acknowledged in the Proposal. The Federal Aviation Administration and Georgia Department of Transportation have agreed to reimburse the Sponsor for portions of the project costs. The Sponsor will not accept or consider proposals from any contractor whose name at the time of opening of bids or contract award appears on the then-current list of ineligible contractors published by the Comptroller General of the United States under Section 5.6(b) of the Regulations of the Secretary of Labor (29) CFR nor a proposal from any firm, corporation, partnership, or proprietorship pertaining in any way to an ineligible contractor who, at the time of the opening of bids or the contract award, has been removed from the Georgia Department of Transportation's list of prequalified contractors. The Sponsor reserves the right to reject any or all bids, to waive informalities, and to readvertise or abandon this solicitation at the Sponsor's sole discretion. Nothing herein shall be construed as a commitment on the part of the Sponsor to award a contract. Doc Notes: Payment will be accepted in the form of a check or money order and can be mailed to the Office of the Engineer, Attn: Amanda Rostin. Allow 24 business hours for processing of bidding documents in digital format (pdf), and 72 business hours for processing of a printed set of bidding documents upon the Engineer's receipt of payment. Bidders are required to obtain the bidding documents directly from the Engineer at least 24 business hours prior to the Bid Opening. No bid will be accepted from a bidder whose name is not included on the Engineer's Plan Holders List.
Bid Results
Transportation Terminals
$844,185.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2025
June 19, 2025
1350 Bishop Rd, Ball Ground, GA
Related To This Project
RFP - Develop and Operate Aircraft Hangar Facility at the Cherokee County Regional Airport - 5808326
Ball Ground, GA
Bid Date: Jun 27 2025
Ball Ground, GA
--
Ball Ground, GA
Bid Date: Jul 02 2025
Ball Ground, GA
Bid Date: Aug 29 2025
Ball Ground, GA
--
Ball Ground, GA
Bid Date: Sep 26 2025
Ball Ground, GA
Bid Date: Oct 15 2025
Ball Ground, GA
Bid Date: Jun 03 2021
Ball Ground, GA
--
Ball Ground, GA
--
Ball Ground, GA
Bid Date: May 02 2025
Ball Ground, GA
Bid Date: Mar 27 2025
Ball Ground, GA
Bid Date: Feb 27 2025
Ball Ground, GA
Bid Date: Jan 30 2025
Ball Ground, GA
Bid Date: Dec 05 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
