Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 20, 2025 at 8:00 PM
Updated May 22, 2025
Site work for a water / sewer project in Dover, Delaware. Completed plans call for site work for a water / sewer project.
Purpose of Contracting for Boggs Drive Drainage Improvement Engineering Support You are hereby notified to commence WORK in accordance with the Agreement date , on or before , and you are to complete the WORK within 180 consecutive calendar days thereafter. The date of completion of all work is therefore anticipated by 2025. SCOPE OF WORK A. The proposer shall perform an ALTA survey, to include topographical and underground infrastructure to show size, inverts and elevations. The proposer should be responsible for all traffic control necessary to conduct any survey. B. The proposer shall perform a Hydrologic and Hydraulic study using the data collected in the ALTA survey to evaluate the capacity of the existing drainage system for a 10 year storm event per City of Dover Public Works Standards and Specifications. C. The proposer shall prepare plans of the proposed drainage improvements showing plan ws and profiles, as well as erosion and sediment controls, which meet the Delaware Department of Natural Resources and Environmental Control (DNREC) regulations. D. The proposer shall obtain the approval of all applicable agencies, including, but not limited to, Kent Conservation District (KCD) and the Delaware Department of Transportation (DelDOT). E. The design shall account for any utility adjustments required by any affected utility in the scope of the drainage improvement plans. F. Any test pitting for vertical location of utilities shall be performed solely by the proposer. G. The construction bid documents shall include an engineer’s estimate of the construction cost for the improvements.
Post-Bid
Water / Sewer
$3,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2025
July 21, 2025
BOGGS Drive, Dover, DE
Related To This Project
Dover, DE
Bid Date: Jan 13 2021
Dover, DE
Bid Date: Jun 04 2025
Dover, DE
Bid Date: May 15 2025
Dover, DE
--
Dover, DE
Bid Date: Jun 05 2025
Dover, DE
Bid Date: May 13 2025
Dover, DE
Bid Date: Jun 04 2025
Dover, DE
Bid Date: Jul 23 2025
Dover, DE
Bid Date: Jun 13 2025
Dover, DE
--
Dover, DE
Bid Date: Jul 10 2025
Dover, DE
Bid Date: May 06 2025
Dover, DE
Bid Date: Jun 06 2025
Dover, DE
Bid Date: May 13 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed