BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work for a road / highway in Shelton, Washington. Completed plans call for site work for a road / highway.

**As of June 20,2025, the project was awarded to Hanson Excavation, with an awarded amount of $421,817.60.** Hwy 106 To Sunnyside Underground Civil Work (S48-S64) for The Contractor will provide all labor, equipment, testing, consumable parts, and 3 boring conduit necessary to complete the project. Question Deadline 04/30/2025 at 4:30 PM PT Comments and questions for the project will close SCOPE OF WORK: The intent of Mason County PUD 1s Hwy 106 To Sunnyside (S48 To S64) Underground Civil Work is to install underground facilities along Highway 101 between Hwy 106 and Sunnyside Rd in preparation for a future project. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the Mason County PUD No. 1 and in an amount of not less than five percent (5%) of the total Proposal amount. The Work shall be physically complete within 30 working days after the commencement date stated in the Notice to Proceed. PREVAILING WAGE: All contractors and subcontractors are required to pay Washington State prevailing wage in accordance with all applicable RCWs and Washington State laws. Contractor shall comply with all requirements concerning public works, without limitation, prevailing wage. . All contractors and subcontractors are required to pay the higher Federal Wage Rate (Davis Bacon) or Washington State prevailing wages. The applicable Davis Bacon Wage Determination number is WA20250053. For questions concerning bid documents, submittal requirements, or technical questions contact Jeremiah Waugh, Engineering Manager at (360)877- 5249 or jeremiahw@mason-pud1.org. COMPLIANCE WITH STATE & FEDERAL GRANTOR REGULATIONS: Financing of the Project has been provided by the Federal Emergency Management Agency (FEMA). General contractors and all subcontractors must meet FEMA requirements and provisions DISTRICT OPTION TO REJECT ALL BID PROPOSALS: The District may, at its sole discretion, reject any or all bid proposals submitted. The District shall not be liable for any costs incurred in connection with the preparation and submittal of any bid proposal. The District reserves the right to waive any informality in a submitted proposal. Date of Final Completion of the Work: 7 days after Substantial Completion August 15 Substantial Completion of Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$421,818.00

Public - County

Site Work

6

6

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
881
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

July 7, 2025

Project location map

Multiple Locations, Shelton, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.