BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work for a fire / police facility in Shelton, Washington. Completed plans call for site work for a fire / police facility.

ESTIMATED COST: $450,000 -$530,000 (Incl. WSST) This project allows for the construction of a secured, fenced parking area for the City's Police Department utilizing a vacated roadway adjacent to the police entrance at the Shelton Civic Center. The Awarded Contractor must maintain access to the police entrance at all times, or coordinate and communicate the need for alternative routes when access is not feasible, to ensure emergency response is not impacted. Work, includes furnishing and installing new perimeter security fencing, vehicle gates (entry and exit), a pedestrian access gate, security lighting, and related security infrastructure. The project also includes demolition, replacement, and/or new landscaped areas, ADA-accessible sloped walkways, concrete sidewalks, and asphalt drive lanes, as needed. Coordination with the City's separate Security System (Contractor will be required in the final phase of the Project to allow for various programming and testing of the security system and associated equipment. The Contractor will have 90 calendar days to complete the work in compliance with all applicable laws and regulations, Written questions regarding the project may be directed to the Procurement & Contracts Administrator, Brooke Kilts, at brooke. kilts@sheltonwa, gov. 1 n your email subject line, reference the project title. All questions must be in the body of the email rather than in an attachment. No response will be made to questions unless they are submitted in w riting to the person noted above and received by 5:00 pm on July 24, 2025. The City will not be responsible for unsuccessful submittals of questions. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Fire / Police

$393,129.00

Public - City

Site Work

13

19

7

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
94
Bidding Soon
1,505
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2025

September 4, 2025

Project location map

Multiple Locations, Shelton, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.