Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 17, 2025 at 8:00 PM
Updated September 18, 2025
Site work for a road / highway in Shelton, Washington. Completed plans call for site work for a road / highway.
All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the Mason County PUD No. 1 and in an amount of not less than five percent (5%) of the total Proposal amount. DISTRICT OPTION TO REJECT ALL BID PROPOSALS: The District may, at its sole discretion, reject any or all bid proposals submitted. The District shall not be liable for any costs incurred in connection with the preparation and submittal of any bid proposal. The District reserves the right to waive any informality in a submitted proposal. SCOPE OF WORK: Mason County PUD 1s N. Valley Dr. to Bourgault Rd. Project (S25-S77) includes Overhead Construction replacing select poles and upgrading the mainline conductor to 336 ACSR (Merlin) and 4/0 ACSR (Penguin). Damaged or copper taps will be replaced with 4 ACSR (Swanate). The segment between Hwy 106 and Sunnyside Rd. will be converted to underground, with 1.2 miles of underground infrastructure installed before cable placement and termination. Following the underground installation, the overhead line in this section will be removed by Contractor. The Work shall be physically complete by October 31, 2025. All contractors and subcontractors are required to pay the higher Federal Wage Rate (Davis Bacon) or Washington State prevailing wages. The applicable Davis Bacon Wage Determination number is WA20250053. DISADVANTAGED BUSINESS ENTERPRISE: Mason County PUD No. 1 is an equal opportunity employer; small, minority and women owned firms are strongly encouraged to apply. Question Deadline 07/24/2025 at 3:30 PM PT ENGINEERS ESTIMATE $1,400,000 - $1,900,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$738,123.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2025
September 30, 2025
Multiple Locations, Shelton, WA
Related To This Project
Shelton, WA
Bid Date: Aug 05 2025
Shelton, WA
--
Shelton, WA
Bid Date: Aug 27 2025
Shelton, WA
Bid Date: Aug 29 2025
Shelton, WA
Bid Date: Sep 11 2025
Shelton, WA
Bid Date: Oct 28 2025
Shelton, WA
Bid Date: Nov 20 2025
Shelton, WA
Bid Date: Jul 30 2025
Shelton, WA
Bid Date: Jul 24 2025
Shelton, WA
Bid Date: Jul 15 2025
Shelton, WA
Bid Date: Jul 01 2025
Shelton, WA
Bid Date: Dec 05 2025
Shelton, WA
Bid Date: Jun 10 2025
Shelton, WA
Bid Date: May 06 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
