EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Pepper Pike, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Each bid must be made upon the Proposal form provided and must be accompanied with a bid bond for the full amount of the bid in favour of the City of Pepper Pike given by a surety company authorized to do business in the State of Ohio, or a certified check or cashier's check in the amount of ten percent (10%) of the amount bid but in no event less than One Hundred Dollars ($100.00). The amount of such bond or check to be paid to the City as stipulated for liquidated damages in the event that the successful bidder fails to enter into the contract under the terms of his/her bid within fourteen (14) days after being notified of the award of the contract to such bidder. The bond of an unsuccessful bidder shall forthwith be cancelled and the check of such bidder returned, or, in the event the check has been deposited the amount shall be returned. When a Contract is entered into, a Surety Bond satisfactory to the City in an amount equal to 100% of the total bid shall be furnished. No bidder may withdraw his/her proposal within 45 days after the opening thereof. Bidders must comply with the prevailing wage rates on Public Improvements in Cuyahoga County and the City of Pepper Pike, Ohio, as determined by the Ohio Department of Industrial Relations. Doc note: SE Blueprint at 2035 Hamilton Avenue Cleveland, OH 44114 or SE Blueprint at 520 South Main Street, Suite 2411 Akron, OH 44311 at the cost of $100.00 + tax and delivery which includes bid registration, one hard copy set of the bid package and one complete set of pdf files. Additional sets of bid documents can also be ordered for an additional cost by visiting online. emailing seblue@seblueprint.com, calling 216-241-2250 or visiting an SE Blueprint location. Bid Descriptions: Sealed bids must be marked "PEPPER PIKE 2025 ASPHALT PROGRAM" or By order of the Council of the City of Pepper Pike, Ohio. Sheila Brett O'Connor, Clerk of Council, City Hall City of Pepper Pike 28000 Shaker Boulevard Pepper Pike, Ohio 44124. The right is reserved to accept any bidder, to reject any or all bids, and to waive informalities should it be deemed to be in the best interest of the City of Pepper Pike to do so.

Post-Bid

Roads / Highways

$1,500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Manufacturing Lines and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
76
Bidding Soon
1,157
All Active Projects
462
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2025

June 2, 2025

img_map_placeholder

Multiple Locations, Pepper Pike, OH

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Pepper Pike 2025 Asphalt Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.