BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2025 at 8:00 PM

Updated March 26, 2026

Renovation of a water / sewer project in Whittier, California. Completed plans call for the renovation of a water / sewer project.

San Jose Creek Water Reclamation Plant Generator Switchgear Control System Upgrades. The existing CAT-ISO control system for the generator switchgear includes a number of obsolete components that are failing and requiring replacement. In addition, the existing components are proprietary, no longer available and based on a particular manufacturer's control system which is not the Districts' standard. The Upgrades will replace the control system with an Allen-Bradley PLC-based control system. The standardized platform will increase the ability of Districts' staff to maintain and upgrade the control hardware and troubleshoot operational issues since they are already trained on this system. Each bid shall be submitted electronically and must be accompanied by a certified check, cashier's check, or bid bond with an approved surety company as surety, payable to Los Angeles County Sanitation District No. 02 or other authorized security provided by Public Contract Code 20784, for an amount equal to at least ten percent of the amount bid as a guaranty that the bidder, if successful, will enter into a contract satisfactory to the Board of Directors for completing the work contemplated. The electronic bid shall include an electronic copy of the certified check, cashier's check, or bid bond, or the Bidder may provide a bid bond authorization code provided to them by Surety2000, which the bidder shall keep in effect until the District gives notice that it may be released. The original must be provided to the District within three(3) working days of the time of electronic bid opening. The successful bidder must file good and sufficient bonds for the faithful performance of the contract and for the payment of laborers and materialmen. Bonds for the faithful performance of the contract and for the payment of laborers and materialmen that are issued by sureties that are listed in the latest version of the U.S. Department of Treasury Circular 570 and that are authorized to issue bonds in the State of California, and whose bonding limitation shown in the circular is sufficient to provide bonds in the amount of the contract, will be deemed approved unless specifically rejected. Bonds issued by all other sureties are subject to approval by the Board of Directors and must be accompanied by all of the documents enumerated in California Code of Civil Procedure 995.660(a), as amended. At the time of bid, the Contractor shall possess a valid California Contractor's License in both of the following classifications: GENERAL ENGINEERING "A" and ELECTRICAL "C-10". The work of construction must be completed within 400 WORKING DAYS after the date in the Notice to Proceed. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. Doc Notes: Bids are to be prepared in accordance with the Bid Documents, Plans, Special Provisions, Standard Specifications for Public Works Construction, 2021 Edition, complete with Los Angeles County Sanitation Districts Amendments to the Standard Specifications for Public Works Construction, 2021 Edition, and any addenda issued by the District (collectively, the "Bid Documents"), which are on file in the Office of the Chief Engineer of the District, 1955 Workman Mill Road, Whittier, California, 90601. For technical questions concerning the project, plans, and specifications, contact Carlo Groag at (562) 908- 4288, extension 2218. Site Walkthrough 05/01/2025 at 10:00 AM PT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$12,315,990.00

Public - County

Renovation

53

11

2

8

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
3
Bidding Soon
2,032
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

August 4, 2025

Project location map

1965 Workman Mill Rd, Whittier, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.