Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

Site work and paving for a mixed-use development in La Crescent, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of June 3, 2025, the project was awarded to Griffin Construction, with an awarded amount of $735,788.27.** The extent of the work involved is furnishing all labor and materials for construction of the Oak Street and South 6th Street Reconstruction together with related subsidiary and incidental work including: The project consists of: 2092 L.F. Remove Cone. Curb and Gutter 522 S.Y. Remove Concrete Walk 320 S.Y. Remove Cone. Driveway Pavement 4809 S.Y. Remove Bituminous Pavement 2587C.Y. Excavation - COMMON (P) 4197 S.Y. Geotextile Fabric, Type 7 (P) 1497C.Y. Aggregate Base, Class 5 (P) 389Ton Type SP 12.5 Wearing Course (SPWEB240B) 389Ton Type SP 12.5 Non-Wearing Course (SPNWB230B) 31L.F. 15" RCP Storm Sewer 79L.F. 12" RCP Storm Sewer 1 LS Temporary Water Service 1 Each 6" Hydrant 13 Each 1 " Corporation Stop 534L.F. 6" PVC Watermain 3 Each Storm Sewer Catch Basin Type 1, O' to 6' Deep 1 Each Storm Sewer Manhole Type 4,48" Diameter 1 Each Construct Drainage Structure Design Special 1 Each Construct Drainage Structure Design Special (Pretreatment Chamber) 13141 S.F. 4" Concrete Sidewalk 1348 S.F. 6" Concrete Sidewalk 2086 L.F. Concrete Curb & Gutter, Design B624 449 S.Y. 6" Concrete Driveway (reinforced) 154S.F. Truncated Domes 1 Each Pedestrian Crosswalk Flasher System 610C.Y. Common Topsoil Borrow (LV) 390 S.F. Crosswalk Pavement Marking Each bid must be accompanied by a certified check, cashier's check or bid bond payable to the City of La Crescent, Minnesota in the amount of at least 5% of the total bid as a guarantee that the bidder will furnish the required bonds and enter into a contract within ten (10) working days, excluding Saturday, Sunday and holidays, after the award of the contract. The Owner reserves the right to withhold up to two hundred and fifty percent (250%) of the cost to correct deficient work or complete work known at the time of substantial completion. Payment of money due will be made in cash no later than sixty (60) days after completion of the work. The Owner reserves the right to withhold one percent (1%) of the total contract amount or five hundred dollars ($500), whichever is greater, pending completion and submission of all final paperwork by the contractor or subcontractors. Final paperwork shall be defined as any documents required to fulfill contractual obligations, including, but not limited to, operation manuals, payroll documents for projects subject to prevailing wage requirements, material certifications and warranties, DBE final clearance, NPDES Permit Termination, withholding exemption certificate, etc. Payment of money due will be made in cash no later than sixty (60) days after submission of all final paperwork. The successful bidder will be required to furnish a Performance and Maintenance Bond and a Payment Bond, both in an amount equal to one hundred (100) percent of the Contract price. Said bonds are to be issued by a responsible surety, approved by the City Council, and which shall guarantee the faithful performance of the Contract and the terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor. Said bond shall also guarantee the maintenance of the improvements constructed for a period of two (2) years from and after its completion and acceptance by the City. Doc note: Copies of said plans and specifications are now on file in the office of the City Administrator, City Hall, La Crescent, MN, for examination by bidders. Bid forms, plans and specifications are available to download at online. The City Council reserves the right to reject any and all bids and to waive technicalities and irregularities. Every request for such interpretation should be in writing addressed to WHKS & Co., 2905 S. Broadway, Rochester, MN 55904 and to be given consideration must be received at least five days prior to the date fixed for the opening of Bids pn- 23788.24.MNR

Award

Roads / Highways

$735,788.00

Public - City

Paving, Site Work

57

11

5

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
1
Bidding Soon
361
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

June 9, 2025

Project location map

S Oak St & 6th St S, La Crescent, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.