Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 10, 2025 at 8:00 PM
Updated June 11, 2025
Renovation of a fire / police facility in Ukiah, California. Completed plans call for the renovation of a fire / police facility.
**As of June 10, 2025, the project was awarded to A Plus Painting , with an awarded amount of$126,300.** Description: Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees for the removal and replacement of gutters at CAL FIRE's Ukiah Station. Contact Information Derek Fergason Phone: Email: derek.fergason@fire.ca.gov 1. Contractor agrees to provide to the California Department of Forestry and Fire Protection (CAL FIRE) Gutter Replacement Services, as described herein: Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees to remove and replace existing gutter systems at CAL FIRE's Ukiah Station. 2. CAL FIRE has the right to extend this agreement for one (1) year by amendment at the same terms, conditions, and costs. 3. Subcontracting is not permitted under this Agreement. All references to subcontracting or Subcontractors as found herein are not applicable to this Agreement. 4. The services shall be performed at CAL FIRE's Ukiah Station, 2690 North State Street, Ukiah, CA 95842 A. Project Overview This project involves the removal and replacement of the existing gutter systems. The new gutters shall be seveninch (7") fascia seamless style, with the addition of Wildland Urban Interface (WUI) approved gutter guards to comply with fire safety standards in California. B. Removal of Existing Gutters 1) Contractor shall carefully remove and dispose of the existing gutter system, including downspouts and any damaged fascia as needed, on all facility buildings. 2) Contractor shall ensure the removal process does not damage the roof, fascia, or any other building components. 3) Contractor shall perform rot repair on an as-needed basis for the fascia. C. Installation of New Gutters 1) Contractor shall install approximately 460 lineal feet of new seven-inch (7") fascia seamless gutters on both the apparatus bay and the barracks buildings.
Award
Fire / Police
$15,000.00
Public - State/Provincial
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2025
June 1, 2025
2690 N State St, Ukiah, CA
Related To This Project
Ukiah, CA
Bid Date: May 27 2025
Ukiah, CA
Bid Date: May 27 2025
Ukiah, CA
Bid Date: May 15 2025
Ukiah, CA
Bid Date: May 29 2025
Ukiah, CA
Bid Date: May 23 2025
Ukiah, CA
Bid Date: May 22 2025
Ukiah, CA
Bid Date: May 15 2025
Ukiah, CA
Bid Date: Jun 10 2025
Ukiah, CA
Bid Date: Apr 29 2025
Ukiah, CA
Bid Date: Apr 11 2025
Ukiah, CA
Bid Date: Mar 28 2025
Ukiah, CA
Bid Date: May 01 2025
Ukiah, CA
Bid Date: Apr 08 2025
Ukiah, CA
Bid Date: Apr 03 2025
Ukiah, CA
Bid Date: Mar 13 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
