BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work, new construction and renovation of a mixed-use development in Independence, Ohio. Conceptual plans call for the construction of a 125,590-square-foot, two-story above grade educational facility; and for the renovation of a educational facility.

The total estimated project cost is $59.5 million which includes: Building construction: $53,350,250 Site improvements and utilities: $4,000,000 Abatement and demolition: $2,002,837 The proposed building would be approximately 125,530 square feet and designed as two schools under one roof: Elementary (PreK–5) and Middle School (6–8) students would have separate wings, entrances, and administrative areas Shared “core” spaces (media center, arts, STEM, common areas) would sit between the two schools A secure connector would allow middle school students continued access to limited high school resources when appropriate All learning spaces are designed to meet or exceed Ohio School Design Manual requirements. The layout reflects extensive input from teachers, administrators, and staff and supports: Small-group and project-based learning Dedicated STEM and science spaces for elementary and middle school students Special education and student support spaces in both school areas A two-story media center with age-appropriate uses Wider corridors and flexible areas for informal learning and collaboration The design includes modern safety features such as: Secured vestibules and controlled entry points Door access control systems Interior and exterior security cameras Safety glazing/film on windows and doors A single connected campus that is easier to supervise than multiple buildings The site plan includes: Separate traffic patterns for buses, parent drop-off, and staff parking, and staggered start times between buildings Dedicated preschool drop-off and parking Clear, one-way traffic flow to reduce congestion and improve safety Final traffic plans will continue to be coordinated with district and city partners. The project is part of the Independence Local Schools 2026 bond issue, which is scheduled for a vote on May 6, 2026. As of April 7, 2026, the district has not released information regarding the design firm, construction manager, or general contractor for the proposed facility. Design work is anticipated to occur from June 2026 through June 2027, followed by substantial construction projected for April 2027 through May 2029. If approved by voters, the project would be funded through a combination of a 0.75-mill bond issue (property tax) and a 1.00% School District Income Tax (SDIT) applied to earned income.

Conceptual

Educational

$59,500,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
361
Active Projects
212
Bidding Soon
3,107
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

Project location map

To Be Determined, Independence, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.