Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 20, 2025 at 8:00 PM
Updated June 21, 2025
Renovation of an educational facility in Inglewood, California. Completed plans call for the renovation of a educational facility.
As of June 20, 2025, the project was awarded to Danny Letner Inc dba Letner Roofing Company, with an awarded amount of $313,000. Roof Restorations District Wide. Value of contract is estimated at $320,000 - $350,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project involves power washing the existing roof system with Simple Green to remove dirt and debris, ensuring the roof is dry before applying any coating material. Prep work includes cutting and removing all blisters, three coursing the splits with Cool Sil and mesh, applying primer to equipment flashings at a rate of 1/2 gallon per square and allowing 6 hours to cure, torch applying Stressply IV Mineral cap sheet to the primed area, and terminating plies with a termination bar set in butyl tape and caulked. Additionally, Cool Sil and mesh will be applied around penetrations, and Unibond ST 4" tape will be applied to all roof seams, ensuring strong adhesion by rolling the tape after installation. Cool Sil Primer will be applied at a rate of 1 gallon per square and allowed to cure for 6-12 hours. The roof field and flashings will receive a silicon, Title 24 white coating (Cool Sil) at 2.5 gallons per square, allowed to cure for 12 hours, followed by another layer at 1.5 gallons per square with 28 pounds per square of Title 24 white minerals embedded into the coating. Finally, all metal pans will be coated with Cool Sil at 2.5 gallons per square. Deadline for RFI’s: On or before May 9, 2025 by 12 PM at christopher.diaz@inglewoodusd.com All questions about the meaning or intent of the Contract Documents are to be directed in writing to the District via email at christopher.diaz@inglewoodusd.com
Award
Educational
$313,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2025
June 20, 2025
Multiple Locations, Inglewood, CA
Related To This Project
Inglewood, CA
Bid Date: Jun 02 2025
Inglewood, CA
Bid Date: May 28 2025
Inglewood, CA
Bid Date: Jul 14 2025
Inglewood, CA
Bid Date: Jun 02 2025
Inglewood, CA
--
Inglewood, CA
Bid Date: Jun 26 2025
Inglewood, CA
Bid Date: Jun 26 2025
Inglewood, CA
Bid Date: Jul 02 2025
Inglewood, CA
Bid Date: May 16 2025
Inglewood, CA
Bid Date: Apr 09 2025
Inglewood, CA
Bid Date: May 14 2025
Inglewood, CA
--
Inglewood, CA
--
Inglewood, CA
--
Inglewood, CA
Bid Date: Mar 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
