BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2025 at 8:00 PM

Updated June 19, 2025

Site work for a bridge / tunnel in Dubuque, Iowa. Completed plans call for site work for a bridge / tunnel.

Cured-In-Place Culvert Linings (10) on Sundown Rd from US 151 to Monastery Rd and (2) on Higginsport Rd Location and Description : Sundown Rd & Higginsport Rd: Late Start Date 5/11/2026 Liquidated Damages Per Day $1000 Proposal Guaranty: $25,000.00 Work Days 10 Payment may be made after July 1, 2025. Winter work will not be allowed. A certified check or a cashier's check made payable to either Dubuque County or the Contractor, drawn upon a solvent bank, or a bid bond or proposal guarantee in an amount set forth in the proposal form, shall be filed with each proposal. A cashier's check, made payable to the Contractor, shall contain an unqualified endorsement to Dubuque County, signed by the Contractor or an authorized agent of the Contractor. If a contractor is awarded the contract, the Contractor shall file with Dubuque County an additional bond in the amount of not less than 100 percent of the contract sum securing the performance of the contract within 15 days of approval or awarding of the contract. Failure to execute that contract, file the second bond, or a certificate of insurance within 15 days of the date of the approval for the awarding of the contract as herein provided, will be just and sufficient cause for the denial of the award and forfeiture of the proposal guarantee. All proposals must be filed on the forms furnished by Dubuque County, sealed and plainly marked. Proposals containing any reservations not provided for in the forms furnished may be rejected, and the County Board reserves the right to waive technicalities and to reject any or all proposals. Dubuque County requires that potential vendors employing personnel required to hold Commercial Drivers Licenses must comply with the provisions of the Commercial Driver's License Regulations, Code of Federal Regulations, Title 49, Part 382, and comply with procedures for the administration of the Department of Transportation substance abuse prevention program.

Award

Bridges / Tunnels

$267,638.00

Public - County

Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

5

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
94
Bidding Soon
1,165
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2025

May 11, 2026

Project location map

Multiple Locations, Dubuque, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.