Site work and paving for a transportation facility in Dubuque, Iowa. Design plans call for site work for a transportation facility; and for paving for a transportation facility.
The Relocate Taxiway Alpha program at DBQ is scheduled to be completed over seven fiscal years and six construction phases. The program began in FY22 to complete programmatic planning documents which included an environmental documented categorical exclusion, topographic and utility survey, geotechnical exploration, a detailed schematic design plan, and construction phasing and budget. FY25 -FY28 Taxiway A Relocation construction (construction Phases 3- 5) are on the SE end of the Airport at the Runway 31 end. Each of these phases includes approximately 1,300 LF of Taxiway A relocation, working to the NW at a standard parallel offset distance of 400 feet from Runway 13/31. Construction Phase 5 is planned for FY 27 and connects Phase 4 and Phase 2, completing the taxiway relocation. Generally all construction phases include earth moving (grading), storm sewer drainage and underdrains, concrete paving, taxiway edge lighting and airfield signage, pavement markings, and turfgrass stabilization. The project is included in the City's 2027-2032 Capital Improvement Program (CIP). As of June 24, 2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Transportation Terminals
$2,850,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
To Be Determined, Dubuque, IA
Related To This Project
Dubuque, IA
Bid Date: May 13 2025
Dubuque, IA
Bid Date: Jul 29 2025
Dubuque, IA
Bid Date: May 09 2025
Dubuque, IA
Bid Date: May 08 2025
Dubuque, IA
Bid Date: May 23 2025
Dubuque, IA
Bid Date: Jun 05 2025
Dubuque, IA
Bid Date: Jun 11 2025
Dubuque, IA
Bid Date: Jun 05 2025
Dubuque, IA
Bid Date: Apr 17 2025
Dubuque, IA
Bid Date: May 06 2025
Dubuque, IA
Bid Date: May 02 2025
Dubuque, IA
Bid Date: May 02 2025
Dubuque, IA
Bid Date: May 01 2025
Dubuque, IA
Bid Date: May 01 2025
Dubuque, IA
Bid Date: May 01 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.