Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
Renovation of a fire / police facility in Dubuque, Iowa. Completed plans call for the renovation of a fire / police facility.
HVAC and boiler replacement for the fire headquarters. The Project consists of the replacement of building HVAC and boiler systems. DESCRIPTION OF ALTERATIONS WORK A. Plumbing: Replace existing system with new construction, keeping existing in operation until ready for changeover. B. HVAC: Replace existing system with new construction, keeping existing in operation until ready for changeover. C. Electrical Power and Lighting: Alter existing system and add new construction, keeping existing in operation The work must commence within 30 days of the date of the Notice to Proceed and must reach Final Completion by August 30, 2025. Each Bidder shall accompany the Bid with a Bid security, in a separate envelope, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of the contract corporate surety bond or bonds, acceptable to the Owner, for the faithful performance of the contract, in an amount equivalent to one hundred percent of the amount of the contract. The bidder's security shall be in an amount equivalent to 5% of the bid amount, and shall be in the form of a cashier's or certified check drawn on a bank in Iowa or a bank chartered under the laws of the United States of America, or a certified bank share draft drawn on a credit union in Iowa or chartered under the laws of the United States of America or a bid bond with corporate surety satisfactory to the Owner. The bid security will be held by the Owner until a contract is fully executed and bonds are approved by the Owner. It is the intent of the Owner to award a contract to the lowest responsible, responsive bidder provided the bid has been submitted in accordance with the bidding requirements. The Owner reserves the right to waive informalities or irregularities. The Owner reserves the right to reject any or all bids. The work must commence on or about ( June 16, 2025 and must be completed on August 30 ,2025. The scope of the Project is as follows: Fire Headquarters HVAC Replacement Project will provide for the replacement of the existing boiler system that is original to the building when it was constructed in 1970. The project will remove the existing boiler and replace it with eight commercial, forced air units that will supply heating and cooling to the different zones within the building. Using the forced air units will provide consistent temperature control within each zone. The system will be less expensive to install and operate more efficiently than a new boiler. In the garage area where the fire and rescue vehicles are parked, two smaller boilers will provide the necessary heat for that area. There will also be upgrades to the duct system within the building and new controls that will operate the system.
Award
Fire / Police
$451,500.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2025
June 16, 2025
11 W 9th St, Dubuque, IA
Related To This Project
Dubuque, IA
Bid Date: Jun 11 2025
Dubuque, IA
Bid Date: Jun 05 2025
Dubuque, IA
Bid Date: Mar 21 2019
Dubuque, IA
Bid Date: Jun 18 2025
Dubuque, IA
Bid Date: Aug 21 2025
Dubuque, IA
Bid Date: Jul 07 2025
Dubuque, IA
Bid Date: May 23 2025
Dubuque, IA
Bid Date: May 08 2025
Dubuque, IA
Bid Date: May 09 2025
Dubuque, IA
Bid Date: Jul 29 2025
Dubuque, IA
Bid Date: May 13 2025
Dubuque, IA
--
Dubuque, IA
Bid Date: Apr 17 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
