Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work and paving for a civil project in Dubuque, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Question Deadline 07/15/2025 To obtain approval to use an unspecified product, a Bidder must deliver written requests to the Engineer at least seven (7) working days before the sealed Bid is due. The extent of the work involved consists of the installation of approximately 4,620 lineal feet of 12 inch water main and 2,180 lineal feet of 16 inch water main and water main appurtenances along North English Road, Southwest Arterial and North Cascade Road. The project also includes the installation of directionally drilled 8 inch water main and approximately 110 lineal feet of 30 inch steel casing. The project also includes various surface restoration including HMA, PCC, granular surfacing and seeding. No pre-bid conference will be held. Each Bidder must accompany its Bid with a Bid security as security that the successful Bidder will enter into a contract for the work Bid upon and will furnish after the award of contract a corporate surety Bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The Bid security must be in the amount of ten percent (10%) of the amount of the contract and must be in the form of a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a statechartered or federally chartered credit union, or the Bidder may provide a Bid Bond with corporate surety satisfactory to the governmental entity. The Bid Bond must contain no conditions except as provided in this section. Work on the Project must be commenced within ten (10) calendar days after the Notice to Proceed has been issued with Substantial Completion for water main to be installed and operational by December 12, 2025, and a Final Completion for final surface restoration completion by May 1, 2026. The City of Dubuque, Iowa, reserves the right to reject any and all Bids.

Award

Water / Sewer

$1,487,135.00

Public - City

Paving, Site Work

31

6

19

4

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
98
Bidding Soon
1,202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2025

August 21, 2025

Project location map

N English Rd, Dubuque, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.