Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 6, 2025 at 8:00 PM
Updated September 7, 2025
Demolition, site work, new construction, renovation and addition to a mixed-use development in Murfreesboro, Tennessee. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; for the construction of a medical facility; for site work for a medical facility; and for the renovation of a medical facility.
Notice ID - 36C77625Q0186 Murfreesboro EHRM Infrastructure Upgrades Construction In accordance with 38 U.S.C. 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran - Owned Small Business (SDVOSB) Set-Aside. The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the EHRM Infrastructure Upgrades Construction project, in accordance with the attached Specifications and Drawings. The project is located at the: Alvin C. York VA Medical Center 3400 Lebanon Pike Murfreesboro, TN 37129 VAAR Magnitude of Construction: $20,000,000 to $50,000,000 For instructions concerning the organized Site Visit - see Attachment 14 - Site Visit Instructions Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Sam Cornwell. Questions shall be submitted only via e-mail to: samuel.cornwell@va.gov. The subject line must read: Murfreesboro EHRM Infra Const - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS August 4, 2025. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 36C77623C0016 The TVHS is seeking a general contractor to provide all necessary tools, labor, materials, equipment, permits, license, supervision, and quality control for EHRM Infrastructure Upgrades - Murfreesboro, TN at the TVHS - Alvin C. York Campus, in accordance with the drawings and specifications. Work includes Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes, cable), renovate space for datacenter (expanded space, cable management, server rack configuration), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for WAN, and Hazardous abatement. The project includes buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 15, 16, 17, 106, 112, 116 East, 116 West, 117, 118, 120, 146, 147 and site. The period of performance is 720 calendar days from the issuance of a Notice to Proceed.
Post-Bid
Medical
$50,000,000.00
Public - Federal
Addition, Demolition, New Construction, Renovation, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 5, 2025
November 4, 2025
3400 Lebanon Rd, Murfreesboro, TN
Related To This Project
Murfreesboro, TN
Bid Date: May 13 2025
Murfreesboro, TN
Bid Date: May 01 2025
Murfreesboro, TN
--
Murfreesboro, TN
--
Murfreesboro, TN
Bid Date: May 15 2025
Murfreesboro, TN
Bid Date: Aug 14 2025
Murfreesboro, TN
Bid Date: May 28 2025
Murfreesboro, TN
Bid Date: May 29 2025
Murfreesboro, TN
Bid Date: May 06 2025
Murfreesboro, TN
--
Murfreesboro, TN
Bid Date: Apr 11 2025
Murfreesboro, TN
Bid Date: Apr 29 2025
Murfreesboro, TN
--
Murfreesboro, TN
Bid Date: Apr 18 2025
Murfreesboro, TN
Bid Date: Apr 03 2019
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
