BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2025 at 8:00 PM

Updated June 12, 2025

Site work for a power facility in Lake Buena Vista, Florida. Completed plans call for site work for a power facility.

The Central Florida Tourism Oversight District (CFTOD) seeks a contractor for replacement of our multiple Live front switches with 9 Dead front PME switches, which includes, but is not limited to pads, 15kV 200amps load break elbow connectors and 15kV 600/900 amps T-OPII elbow connectors. In addition to the installation of the PME switches, contractor shall be removing transformers, installing transformer and reconfiguring the circuit by running new cables, splicing into existing cables and directional drilling. This work will take place at multiple locations throughout CFTOD property. The scope of this project includes providing concrete encased duct bank, directional drilled conduits, direct buried conduits, electric pull boxes, temporary generator support and switch pads. Providing 15kV cable splices and cable terminations as indicated. Installing Owner-furnished PME type pad mounted switches and Owner-furnished 15kV cable. Contractor shall provide generators and MOT as required. This project will be a multi-year project covering multiple locations and will require planning the work and coordinating and requesting multiple outages. These outages will depend on approval from The Walt Disney World Company and/or Reedy Creek Energy Services (RCES). The above descriptions are intended to give a general definition of the Scope of Work and shall not be construed to be an itemized listing of all elements of work involved. The Contractor shall be responsible for the construction of complete facilities, conforming in all respects to the details and requirements of the specifications, drawings, and other contract documents. Please direct all questions to: Name: Andrea Osinski Phone: (689) 254-4346 Address: 1900 Hotel Plaza Blvd. Lake Buena Vista, FL 32830 Email: aosinski@oversightdistrict.org Liquidated Damages $1,685 per calendar day Start/Delivery Date Approx. June 2, 2025 Project Duration 1,095 days from NTP (includes all phases) Q&A Deadline 05/26/2025 6:00 PM (EDT)

Bid Results

Power Plant

$1,170,299.00

Public - County

Site Work

41

25

4

7

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
99
Bidding Soon
2,969
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

July 10, 2025

Project location map

5300 Center Dr, Lake Buena Vista, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.