Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work for a water / sewer project in Moss Landing, California. Completed plans call for site work for a water / sewer project.

** As of July 18,2025 , this project has not yet been awarded. The project is expected to be awarded on July 23,2025.** Bids shall include: Unit cost per cubic yard for dredging, inclusive of equipment, pipelines "about 7000 feet, scow, labor, and materials; Lump sum for Capitol Mobilization and Demobilization; Daily rate for standby time to include all equipment, labor, and materials. 2. Project Information. 2.1 Location and Description. The Project is located at Moss Landing Harbor and is described as follows: Dredging specific areas within Moss Landing Harbor to in clude berthing areas, slips and channels, with disposal at the ocean site "SF 12" and potentially the beach disposals on either side of the harbor. The total quantity to be dredged is a minimum of 63,000 cubic yards and may exceed 86,000 cubic yards. Time for Final Completion. The Project must be fully completed between June 1st and November 30, 2025 but the anticipated start date is provided solely for conven ience. Question Deadline 05/16/2025 Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to General Manager Tommy Razzeca, at razzeca@mosslandingharbor.dst.ca.us The District anticipates that the Work will begin on or about June 1, 2025, but the anticipated start date is provided solely for convenience and is neither cer tain nor binding. Bid Security. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to Moss Landing Harbor District, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. Any bid protest against another bidder must be submitted in writing and received by the District at 7881 Sandholdt Rd. Moss Landing Ca, 95039 or sent via email to razzeca@mosslandingharbor.dst.ca.us before 5:00 p.m. no later than two Working Days following bid opening and must comply with the following requirements: Performance and Payment Bonds. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents.

Bid Results

Water / Sewer

$4,168,700.00

Public - Federal

Site Work

7

5

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
124
Bidding Soon
2,208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

August 1, 2025

Project location map

7881 Sandholdt Rd, Moss Landing, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed