BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work and paving for a mixed-use development in Kentwood, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000384540 Work shall include pavement removal, sawcut or milled (vertical) edges, grading as necessary, aggregate base compaction, adjusting casting(s) to provide proper drainage and ride, tacking (bond coat) of existing edges, and traffic control. Patches shall be a minimum of two lifts of two (2) inches each of MDOT 13A or other approved mix. Patches shall match existing pavement depth where greater than four (4) inches. All patches at the edge of pavement shall have rolled curb. At least one (1) lane of traffic in each direction must be maintained; flagging will be allowed. The estimated need for the 2025 Work is 9,245 square feet at 233 tons. See the attached EXHIBIT A (3 pages) for site locations, approximate patching sizes, and additional notes. Exhibit A locations are marked with paint. The locations are also photo documented by address and can be viewed on the map at the online Bid Intent Optional Bid Intent Deadline 05/06/2025 10:00 AM EDT Question Deadline 04/29/2025 at 1:00 PM ET change from 02:00 PM Questions are submitted online Yes For further information or questions on the specifications of Work within this RFP, please contact Brad Boomstra at (616) 554-0740 / BoomstraB@kentwood.us or Cori Derengowski at (616) 554- 0760 / DerengowskiC@kentwood.us by the inquiry due date (in header). Questions submitted after the due date and time may not be considered. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The proposal must be accompanied by a cashier's check, certified check, or bid bond made payable to the City of Kentwood in the sum of five percent (5%) of the amount of the bid which shall be retained by the City of Kentwood if the successful Respondent does not enter into a contract for the Work nor provide good and sufficient Performance Bond and/or insurance certification within 10 days of the award of a contract, said retention by the City of Kentwood as liquidated damages, not as a penalty. Performance and Payment Bonds: As part of the Contract, for contracts over $50,000, the Contractor will be required to provide, prior to the start of the Work, Performance and Payment Bonds equal to the total value of the contract, in a manner and form acceptable to the City. Work shall include pavement removal, sawcut or milled (vertical) edges, grading as necessary, aggregate base compaction, adjusting casting(s) to provide proper drainage and ride, tacking (bond coat) of existing edges, and traffic control. Patches shall be a minimum of two lifts of two (2) inches each of MDOT 13A or other approved mix. Patches shall match existing pavement depth where greater than four (4) inches. All patches at the edge of pavement shall have rolled curb. At least one (1) lane of traffic in each direction must be maintained; flagging will be allowed. The estimated need for the 2025 Work is 9,245 square feet at 233 tons. See the attached EXHIBIT A (3 pages) for site locations, approximate patching sizes, and additional notes. Exhibit A locations are marked with paint.

Award

Roads / Highways

$60,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
0
Bidding Soon
708
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 5, 2025

Project location map

Multiple Locations, Kentwood, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.