BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Site work and paving for a mixed-use development in Longmont, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000384768 Bid Intent Not Available Scope: The primary work to be performed under this Contact includes rehabilitation of the bridge carrying Hover St. Over St. Vrain Creek. Work elements include sidewalk panel replacement, concrete pavement panel replacement, and expansion joint replacement. Contractor must furnish all labor, materials, and equipment necessary to complete the work. Note that any modifications to the existing signals at Hover St. And 3rd Ave. for the purpose of traffic control must be coordinated with a City-selected contractor. Minimum Qualifications: The Contractor must have completed at least three (3) projects of similar scope and complexity valued at least $350,000 per project in the last 5 years. Question Deadline 05/12/2025 at 5:00 PM MT Questions are submitted online No Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % A Bid Guarantee in an amount equal to 5% of the total Bid amount is required at the time of the Bid Opening. The Guarantee must be a Bid Bond executed by the Bidder on the City's own form, or a cashier's check payable to the City of Longmont. No Bid will be considered unless accompanied by the Bid Guarantee. If awarded the Bid, a Performance Bond and a Labor and Material Payment Bond executed on the City's own forms are required within 10 days of the date the written Notice of Award, each for the total amount of the Contract Price. The City of Longmont reserves the right to cancel this Invitation to Bid; reject any bid, in whole or in part; to adjust the quantity of Work to be done as mandated by budgetary requirements; and to waive informalities or irregularities in the bids received; when it is in the City's best interest to do so.

Bid Results

Bridges / Tunnels

$419,644.00

Public - City

Paving, Site Work

30

13

5

10

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
109
Bidding Soon
1,369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

June 30, 2025

Project location map

Hover St, Longmont, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.