Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Demolition, site work and addition to a water / sewer project in Palm Coast, Florida. Completed plans call for the addition of a water / sewer project; and for site work for a water / sewer project.

The existing Palm Coast WWTF No. 1 is a conventional activated sludge (oxidation-ditch) domestic wastewater plant with a permitted Annual Average Daily Flow (AADF) capacity of 6.83 million gallons per day (MGD) and operates under the Florida Department of Environmental Protection (FDEP) Permit No. FL0116009. The WWTF No.1 expansion will add 4.0 MGD, ADDF treatment capacity using a 5-stage Barenpho treatment process to achieve advanced wastewater treatment (AWT). The existing oxidation ditches will be upgraded to achieve AWT but the scope of this RFP doesn't include the upgrade. CPH Consulting, LLC (Engineer) has been engaged by the City to deliver engineering services for the design and permitting phases of the WWTF No.1 expansion. Wharton-Smith, Inc (Contractor) has been chosen by the City as the general contractor, utilizing the Construction Manager at Risk (CMAR) method. The expansion will add a 4.0 MGD, AADF capacity treatment process by the following units to meet the AWT requirements: 1. Influent pump station 2. Headworks - grit removal and screen equipment 3. Odor control system 4. Flow equalization(EQ) tank with aeration and mixing equipment 5. EQ pumping systems 6. Anerobic tanks 7. Pre-Anoxic tanks 8. Aeration tanks (oxic tanks) 9. Post-Anoxic tanks 10. Reaeration tanks 11. Blower Systems, diffuser systems and DO control system for the oxic zones and reaeration zones 12. Mixing equipment for all anaerobic, fermentation and anoxic tanks 13. Return activated sludge pumps and internal recycle pumps 14. Clarifiers 15. Sludge holding tanks 16. Disk filters 17. Chlorine Contact Chambers (CCC) 18. Reclaimed water transfer pumps 19. Chemical feed systems including alum, Micro-C, sodium hypochlorite, polymer and other chemical storage and feed systems 20. Any other needed improvements for the WWTF No.1 upgrade and expansion Questions Due Date: May 22nd 2025, 2:00 PM EDT

Award

Water / Sewer

$6,000,000.00

Public - City

Addition, Demolition, Site Work

19

8

2

8

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
142
Bidding Soon
1,779
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

August 4, 2025

Project location map

Multiple Locations, Palm Coast, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.