Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 21, 2025 at 8:00 PM
Updated July 1, 2025
Site work and paving for a bridge / tunnel in New Underwood, South Dakota. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bridge Hit Repair at Exit 63 and West Gate Road Bridges Project Location: I90 west - Exit 63 A bid bond will not be required. Completion Date November 14, 2025 The successful bidder must provide a performance bond in the total amount of the contract prior to beginning work on the project as per section 3.5 of the Standard Specifications A cashiers check, money order or other monetary instrument in the total amount of the contract, made out to and under the full control of the Department is acceptable in lieu of a performance bond. Such bond shall remain in effect for not less than one year after date of acceptance of the completed contract by the Department. Prequalification: Pursuant to South Dakota Administrative Rules 70:07:02, Classification and Bidding Capacity Rating for Highway Contracts, and Section 2.1 of the SDDOT Standard Specifications For Road and Bridges, all bidders on highway construction projects over $250,000.00 shall be pre-qualified. Work Type: 7 or 8 SDDOT: Bridge Hit Repair at Exit 63 and West Gate Road Bridges
Bid Results
Bridges / Tunnels
$264,697.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
June 5, 2025
I-90, New Underwood, SD
Related To This Project
Replace the Existing HVAC System at the New Underwood Sub and Install Mini-Split HVAC Unit - 5794412
New Underwood, SD
Bid Date: May 30 2025
New Underwood, SD
Bid Date: Jun 12 2025
New Underwood, SD
Bid Date: Apr 16 2025
New Underwood, SD
Bid Date: Feb 05 2025
New Underwood, SD
Bid Date: Jan 22 2025
New Underwood, SD
Bid Date: Dec 30 2024
New Underwood, SD
Bid Date: Sep 10 2024
New Underwood, SD
Bid Date: Sep 18 2024
New Underwood, SD
Bid Date: Sep 05 2024
New Underwood, SD
Bid Date: Jun 26 2024
New Underwood, SD
--
New Underwood, SD
--
New Underwood, SD
--
New Underwood, SD
Bid Date: Feb 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
