Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Renovation of a mixed-use development in Lena, Wisconsin. Completed plans call for the renovation of a educational facility.

As of June 26, 2025. Project was awarded to Custofoam Roofing Solutions, but no awarded amount is available. The Lena Public School District is asking for a roof replacement bid. The Board of Education reserves the right to accept or reject any and all bids. Prior to the start of the _ _ aj Roofing Solutions will meet with owner representative to complete a pre-job meeting to determine jobsite logistics ad assure that all safety policies are adhered to.- - - - , - - - - Provide necessary equipment, material, & labor to complete scope of work below. Remove existing rock and membrane and dispose. Mechanically Fasten M" Brown board over existing insulation. Provide & install approx. 10,105 Sq. Ft. of new Carlisle 45 Mil TPO roof system o Mechanically Fastened o Heat Welded Seams o All membrane & accessories to be installed per manufactures specifications Provide & install Carlisle TPO roofing accessories. ' Provide & install new One Edge Fascia with color chosen from standard color chart. Provide 15-year total systems manufactures warranty. Perform final clean-up and dispose of any job-related debris. Prior to the start of the"aaiaMR, Roofing Solutions will meet with owner representative to complete a pre-job meeting to determine jobsite logistics ad assure that all safety policies are adhered to. Provide necessary equipment, material, & labor to complete scope of work below. Remove loose membrane and dispose. Price includes 2,000 SF of wet insulation removal. Provide & install approx. 14,580 Sq. Ft. of new Carlisle 45 Mil Black EPDM FleeceBACK roof system o Fully Adhered o Adhered Seams o All membrane & accessories to be installed per manufactures specifications Provide & install Carlisle EPDM roofing accessories. Provide & install new CB-175 with color cover bar chosen from standard color chart over existing metal. Provide 15-year total systems manufactures warranty. Perform final clean-up and dispose of any job-related debris.

Award

Educational

$200,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 4, 2025

Project location map

Multiple Locations, Lena, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed