BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 21, 2025 at 8:00 PM

Updated May 22, 2025

Site work and paving for a sidewalk / parking lot in New Underwood, South Dakota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

PCC Sidewalk at Exit 60 Project Location: PCC Sidewalk at Exit 60 A bid bond will not be required. Completion Date November 14, 2025 The successful bidder must provide a performance bond in the total amount of the contract prior to beginning work on the project as per section 3.5 of the Standard Specifications. A cashiers check, money order or other monetary instrument in the total amount of the contract, made out to and under the full control of the Department is acceptable in lieu of a performance bond. Such bond shall remain in effect for not less than one year after date of acceptance of the completed contract by the Department. Prequalification: Pursuant to South Dakota Administrative Rules 70:07:02, Classification and Bidding Capacity Rating for Highway Contracts, and Section 2.1 of the SDDOT Standard Specifications For Road and Bridges, all bidders on highway construction projects over $250,000.00 shall be pre-qualified. Work Type: 3, 4 and 14 SDDOT: PCC Sidewalk at Exit 60

Bid Results

Sidewalks / Parking Lot

$177,375.00

Public - State/Provincial

Paving, Site Work

15

5

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
5
Bidding Soon
195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 5, 2025

Project location map

I-90, New Underwood, SD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.