BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2025 at 8:00 PM

Updated April 25, 2025

Site work and paving for a road / highway in Coconut Creek, Florida. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of April 24, 2025, an engineer has been selected and this project is in the final planning phase. It is anticipated bidding will commence in September 2025. Construction is expected to start in fall 2025 and be completed in fall 2026. Scope of Work: Extend southbound dual left-turn lanes on Lyons Road Extend eastbound right-turn lane on Atlantic Boulevard Improve sidewalk south of Atlantic Boulevard, eastbound Upgrade lighting along Atlantic Boulevard Replace damaged light pol

Final Planning

Roads / Highways

$1,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
119
Bidding Soon
1,788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

Project location map

FL-814, Coconut Creek, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.