Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 16, 2025 at 8:00 PM
Updated March 17, 2025
Renovation of a playground / park / athletic field in Coconut Creek, Florida. Conceptual plans call for the renovation of a playground / park / athletic field.
Update:https://www3.coconutcreek.net/docs/finance/Budget-2025.pdf To optimize the City's existing parks and recreation resources and assets as well as strategically plan for the future, the City adopted a Parks and Recreation Master Plan in 2019. The Plan provides a 10-year vision for parks, recreation, and open space and trails as well as an action plan for implementing this vision. Proposed improvements include: FY27: Design FY28: Site Furnishings, Picnic Pavilion Replacement, 8' wide Paved Multi-Purpose Path with Improved, All Inclusive Access, Public Art, Signage, and Adult Fitness Equipment Project is included City of Coconut Creek Fiscal Year 2025-2029 Page No 417 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update : https://www3.coconutcreek.net/docs/finance/budget.pdf To optimize the City's existing parks and recreation resources and assets as well as strategically plan for the future, the City adopted a Parks and Recreation Master Plan in 2019. The Plan provides a 10-year vision for parks, recreation, and open space and trails as well as an action plan for implementing this vision. Proposed improvements include: FY26: Design FY27: Site Furnishings, Picnic Pavilion Replacement, 8' wide Paved Multi- Purpose Path with Improved, All Inclusive Access, Public Art, Signage, and Adult Fitness Equipment Project is included City of Coconut Creek FY 2024-2028 Page No 421 --------------------------------------------------------------------------------------------------------------------------------- To optimize the Citys existing parks and recreation resources and assets as well as strategically plan for the future, the City adopted a Parks and Recreation Master Plan in 2019. The Plan provides a 10-year vision for parks, recreation, and open space and trails as well as an action plan for implementing this vision. Improvements proposed for FY22 include site furnishings, 8' wide paved multipurpose path, food truck parking, public art/basketball court art mural, wayfinding with QR codes, dog waste stations, movable lawn furniture, charging stations, WiFi, and native butterfly plantings. As of September 17, 2021 no new CIP issued, this project is currently in the FY 2021-2025 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Playgrounds / Parks / Athletic Fields
$2,612,500.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2029
4715 NW 30th St, Coconut Creek, FL
Related To This Project
Coconut Creek, FL
--
Coconut Creek, FL
Bid Date: Mar 21 2025
Coconut Creek, FL
--
Coconut Creek, FL
Bid Date: Apr 02 2025
Coconut Creek, FL
Bid Date: Apr 16 2025
Coconut Creek, FL
--
Coconut Creek, FL
--
Coconut Creek, FL
Bid Date: May 28 2025
Coconut Creek, FL
Bid Date: Apr 08 2025
Coconut Creek, FL
Bid Date: Apr 16 2025
Coconut Creek, FL
Bid Date: Apr 22 2025
Coconut Creek, FL
Bid Date: Mar 10 2025
Coconut Creek, FL
--
Coconut Creek, FL
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
