BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2025 at 8:00 PM

Updated May 9, 2025

Renovation of a mixed-use development in Romulus, Michigan. Completed plans call for the renovation of a educational facility.

The scope of the gas main work are set forth in Attachment D, attached and incorporated herein by reference. The scope of services may change as the project progresses in the Schools sole discretion. Reference Number 0000384806 Bid Intent: Not Available Delivery Point: 18601 Middlebelt Road, Romulus, MI. 48174 Purchase Type: One Time Only- Delivery Date: June 16, 2025 The school is securing bids to remove and replace existing gas mains and lines to increase gas volume to various HVAC and RTU points. The school is securing sealed bids to remove and replace existing (natural) gas lines inside both the middle school and high school sections/wings. The overall objective is to increase gas volume to accommodate new larger HVAC/RTU Units that are currently installed. Ideally, a 2" gas main to be installed in each hallway between drop ceiling and bottom of ceiling deck, with 1" and 3/4" branch lines to various HVAC Units. Each wing of high school and middle school have separate gas meters with elevated pressure currently set at 2 PSI. Overall, there are 32 HVAC Units, 17 in middle school wing, and 15 in the high school wing. Each wing is consuming approximately 2.3 million BTU's at full capacity. Additionally, a separate 2" gas line to be installed in middle school wing to accommodate a 20kw outdoor on demand generator. Site of generator will be discussed at the walk through on May 2, 2025. The job can commence the week of June 16, 2025, and must be completed in 4-5 weeks, maximum based on school schedule. PROJECT START DATE: June 16, 2025 PROJECT END DATE: July 18, 2025 Including all inspections Question Deadline 05/07/2025 at 9:00 AM ET Questions are submitted online No The School reserves the right to reject any or all proposals, to award Project components by component, group of components, or total Project, to accept any or all alternatives, to accept any proposal in whole or in part, to waive any irregularities or informalities which are in the best interest of the School, and to weigh proposal elements as deemed beneficial to the School. Any award shall be to the Contractor(s) that the School considers the lowest responsible bidder.

Post-Bid

Educational

$400,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
344
Active Projects
123
Bidding Soon
2,533
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

June 16, 2025

Project location map

18601 Middlebelt Rd, Romulus, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.