Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work for a civil project in Valdosta, Georgia. Completed plans call for site work for a water / sewer project.

sewage lift station and sewer gravity main including related work. The work consists of the installation of demolition and reconstruction of an existing sewage lift station, installation of +/- 230 linear feet of new gravity sanitary sewer, reconnections to 4 sanitary sewer force main, with the associated water main fittings and appurtenances, and other related grading, demolition, repair and patching, grading, grassing, and all related work. This will be a Unit Price Contract, and payments will be made on a monthly basis with payment to be based on actual quantities of work measured. The list of items shown in the Unit Price Schedule is inclusive of all the work shown and described. The contract time is 300 calendar days. For more information contact Charlie Clark, Engineering Project Manager, at (229) 259-3530. Question Deadline 05/16/2025 Location of Resurfacing Work: The location of the work is within the City of Valdosta, more specifically at two locations: 1) The existing sewage lift station is on the south side of Knights Academy Road and east of the Knights Mill Subdivision entrance, Knights Mill Drive, and 2) The gravity sewer main work is on the south side of Mount Zion Church Road at the intersection with Walden Road. Description of Work: The work consists of the installation of demolition and reconstruction of an existing sewage lift station, installation of +/- 230 linear feet of new gravity sanitary sewer, reconnections to 4" sanitary sewer force main, with the associated water main fittings and appurtenances, and other related grading, demolition, repair and patching, grading, grassing, and all related work. Schedule of Work: The Contractor shall submit a schedule of work to the City Engineer's office before construction begins. Times of construction shall be 8:00 AM to 6:00 PM Monday through Friday and 9:00 AM to 4:00 PM on Saturday. Clarifications and Special Conditions: 1. The Owner shall adjust the line item quantities as required to bring project cost to within the available funding. 2. In addition to the Pre-Construction Meeting, the Contractor shall establish a regular schedule for bi-weekly project status meetings with City Engineering Department staff.

Bid Results

Water / Sewer

$947,908.00

Public - City

Site Work

9

5

13

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
1
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

June 23, 2025

Project location map

Multiple Locations, Valdosta, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.