Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 17, 2025 at 8:00 PM
Updated July 18, 2025
Site work for a civil project in Valdosta, Georgia. Completed plans call for site work for a water / sewer project.
sewage lift station and sewer gravity main including related work. The work consists of the installation of demolition and reconstruction of an existing sewage lift station, installation of +/- 230 linear feet of new gravity sanitary sewer, reconnections to 4 sanitary sewer force main, with the associated water main fittings and appurtenances, and other related grading, demolition, repair and patching, grading, grassing, and all related work. This will be a Unit Price Contract, and payments will be made on a monthly basis with payment to be based on actual quantities of work measured. The list of items shown in the Unit Price Schedule is inclusive of all the work shown and described. The contract time is 300 calendar days. For more information contact Charlie Clark, Engineering Project Manager, at (229) 259-3530. Question Deadline 05/16/2025 Location of Resurfacing Work: The location of the work is within the City of Valdosta, more specifically at two locations: 1) The existing sewage lift station is on the south side of Knights Academy Road and east of the Knights Mill Subdivision entrance, Knights Mill Drive, and 2) The gravity sewer main work is on the south side of Mount Zion Church Road at the intersection with Walden Road. Description of Work: The work consists of the installation of demolition and reconstruction of an existing sewage lift station, installation of +/- 230 linear feet of new gravity sanitary sewer, reconnections to 4" sanitary sewer force main, with the associated water main fittings and appurtenances, and other related grading, demolition, repair and patching, grading, grassing, and all related work. Schedule of Work: The Contractor shall submit a schedule of work to the City Engineer's office before construction begins. Times of construction shall be 8:00 AM to 6:00 PM Monday through Friday and 9:00 AM to 4:00 PM on Saturday. Clarifications and Special Conditions: 1. The Owner shall adjust the line item quantities as required to bring project cost to within the available funding. 2. In addition to the Pre-Construction Meeting, the Contractor shall establish a regular schedule for bi-weekly project status meetings with City Engineering Department staff.
Bid Results
Water / Sewer
$947,908.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
