Renovation of an educational facility in Oxford, Ohio. Completed plans call for the renovation of a educational facility.
Hoyt Data Center Update Question Cutt off Date & Time 5/14/2025 12:00:00 PM (ET) Scope A. The scope of work includes the provision of all items, articles, materials, operations, or methods listed, mentioned, or herein specified including labor, materials, equipment, and incidentals necessary and required for their completion. B. The work includes the furnishing and installing of a complete wet system fire sprinkler system and standpipe systems for all buildings, and shall include fire pumps and ancillary devices if required. C. Fire sprinkler connections to the dedicated main shall be furnished and installed. See Division 33. D. Each floor of the building shall be designed as a separate sprinkler zone and supplied from a standpipe riser located within a stairwell. E. A complete combined automatic wet pipe sprinkler/Class 1 manual wet standpipe system shall be installed throughout the building. The sprinkler system shall be installed in accordance with NFPA 13. Systems, or portions thereof, complying with NFPA 13R will not be accepted as base bid. The standpipe system shall be installed in accordance with NFPA 14. F. A dry system will be provided in building attics as required. Dry pipe valves shall be located one floor below the attic level. Wet pipe systems are preferred where practical. G. The University Fire Marshal will provide the Contractor with water supply flow test information. This information shall be used as the design basis for hydraulic calculations. H. The system designer shall assume a 150psi inlet pressure at the remote fire department connection for purposes of sizing the standpipe system for required flow. I. Tests: 1. Test underground service piping in accordance with NFPA 24. 2. Test overhead sprinkler piping in accordance with NFPA 13. 3. Test standpipe piping in accordance with NFPA 14. J. Related Work: 1. See Division 33 for new sprinkler underground connection point for fire suppression system. 2. See Division 28 for system alarm panels and associated equipment.
Award
Educational
$199,850.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 19, 2025
June 18, 2025
521 S Patterson Ave, Oxford, OH
Related To This Project
Oxford, OH
Bid Date: May 29 2025
Oxford, OH
Bid Date: May 28 2025
Oxford, OH
Bid Date: May 23 2025
Oxford, OH
Bid Date: Sep 25 2025
Oxford, OH
Bid Date: Jun 30 2025
Oxford, OH
Bid Date: Jul 08 2025
Oxford, OH
Bid Date: Jul 21 2025
Oxford, OH
Bid Date: May 09 2025
Oxford, OH
Bid Date: May 12 2025
Oxford, OH
Bid Date: May 05 2025
Oxford, OH
Bid Date: Apr 16 2025
Oxford, OH
--
Oxford, OH
Bid Date: Apr 16 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.