BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Site work and new construction of a mixed-use development in West Covina, California. Working plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

**As of June 2, 2025, no bid receive . No definite date for the rebid. The City-owned 8.27-acre property consists of the City yard building and facility, the "Shop" with automotive bays, an operational fire station (Station #121), and a vacant former chamber building. Proposals shall include a replacement of Fire Station #121. Site Overview: The City-owned parcel APN: 846-01-904 includes the following buildings/infrastructure: o City Yard facility including o Office (10,275 Square feet) o Streets warehouse (7,006 square feet) o Workshop (3,158 square feet) o Paint shed (1,395 square feet) o Parks equipment warehouse (2,590 square feet) o Vacant Fire Station (Station #121) (6,657 square feet) o Vacant former chamber building (5,169 square feet) o The "Shop" automotive bays (9,090 square feet) o Two (2) CNG Stations (1 with propane) o Fire Station operating out of a temporary trailer (2,400 square feet) Note: Square footages provided above are approximations. The sale of the City Site would be contingent on the relocation of Fire Station #121 and be dependent on the relocation of the City yard facility which could include identifying a new site for the City yard, possible purchase of new site, and the development of the new City yard facility. Online Q&A Yes Q&A Deadline 04/17/2025 10:00 AM (PDT) PROJECT SUMMARY SECTION The Project Summary Section should include a description of the proposed development project including: Conceptual Design Size of buildings space Type of proposed uses (e.g. commercial, mixed-use combination, type of residential products) Proposal for Fire Station #121 (formally Station 1) Proposals must also respond to the following questions: 1. Explanation of the role the Developer's organization will play in the proposed project and a list of other partners and their roles (if any). 2. The proposed general timeframe for the development of the Developer's proposed project. If multiple components or phases are planned, a list of all. 3. Description of the benefit(s) the proposed project brings to the City including: a. Land sale price offer to purchase the site b. Projected property tax revenues from the project c. Projected sales tax and other revenues from the project (if applicable) d. Projected number of direct jobs e. Number of housing units (if applicable)

Final Planning

Fire / Police

$600,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
603
Active Projects
269
Bidding Soon
3,450
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

December 5, 2025

Project location map

S Sunset Ave & W Cameron Ave, West Covina, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.