Published May 10, 2025 at 8:00 PM

Updated May 11, 2025

Site work and paving for a sidewalk / parking lot in Newport Beach, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project segment for the Arterial Street Improvements is 17th Street from Palm Avenue to Main Street. The street segment improvements consists primarily of cold milling of the existing pavement, deep lift removal of failed roadway sections, asphalt base paving, rubberized asphalt concrete (RAC) surface course paving, limited removal and installation of concrete curb and gutter, concrete sidewalk, curb access ramps, cross gutters, driveway approaches, reconstructing local depression, tree replacements, installing composite manholes and valves to grade, and installing traffic loops with striping and signage. Question Deadline 05/01/2025 at 10:00 AM PT Online Q&A Yes Response Types Line Items Type of Award Lump Sum License Requirements CLass A The contract shall allow the Contractor 60 working days to complete the contract. Project NTP shall start no later than Monday, June 23, 2025. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Description: The project segment for the Arterial Street Improvements is 17th Street from Palm Avenue to Main Street. The street segment improvements consists primarily of cold milling of the existing pavement, deep lift removal of failed roadway sections, asphalt base paving, rubberized asphalt concrete (RAC) surface course paving, limited removal and installation of concrete curb and gutter, concrete sidewalk, curb access ramps, cross gutters, driveway approaches, reconstructing local depression, tree replacements, installing composite manholes and valves to grade, and installing traffic loops with striping and signage. The contract shall allow the Contractor 60 working days to complete the contract. Project NTP shall start no later than Monday, June 23, 2025. All questions related to this bid solicitation must be submitted through the City’s PlanetBids System Vendor Portal per the information provided in the Instructions to Bidders. Any other contact to City staff regarding this bid solicitation will be referred back to the PlanetBids system. The AGENCY reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a maximum period of 60 days. BY ORDER of the CITY COUNCIL of the CITY OF HUNTINGTON BEACH, CALIFORNIA, the 21st day of May 2024, by Resolution No. 24-349.

Bid Results

Sidewalks / Parking Lot

$1,684,111.00

Public - City

Paving, Site Work

10

12

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
3
Bidding Soon
2,235
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 23, 2025

Project location map

17th St, Newport Beach, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.