Published May 10, 2025 at 8:00 PM
Updated May 11, 2025
Site work and paving for a sidewalk / parking lot in Newport Beach, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The project segment for the Arterial Street Improvements is 17th Street from Palm Avenue to Main Street. The street segment improvements consists primarily of cold milling of the existing pavement, deep lift removal of failed roadway sections, asphalt base paving, rubberized asphalt concrete (RAC) surface course paving, limited removal and installation of concrete curb and gutter, concrete sidewalk, curb access ramps, cross gutters, driveway approaches, reconstructing local depression, tree replacements, installing composite manholes and valves to grade, and installing traffic loops with striping and signage. Question Deadline 05/01/2025 at 10:00 AM PT Online Q&A Yes Response Types Line Items Type of Award Lump Sum License Requirements CLass A The contract shall allow the Contractor 60 working days to complete the contract. Project NTP shall start no later than Monday, June 23, 2025. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Description: The project segment for the Arterial Street Improvements is 17th Street from Palm Avenue to Main Street. The street segment improvements consists primarily of cold milling of the existing pavement, deep lift removal of failed roadway sections, asphalt base paving, rubberized asphalt concrete (RAC) surface course paving, limited removal and installation of concrete curb and gutter, concrete sidewalk, curb access ramps, cross gutters, driveway approaches, reconstructing local depression, tree replacements, installing composite manholes and valves to grade, and installing traffic loops with striping and signage. The contract shall allow the Contractor 60 working days to complete the contract. Project NTP shall start no later than Monday, June 23, 2025. All questions related to this bid solicitation must be submitted through the City’s PlanetBids System Vendor Portal per the information provided in the Instructions to Bidders. Any other contact to City staff regarding this bid solicitation will be referred back to the PlanetBids system. The AGENCY reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a maximum period of 60 days. BY ORDER of the CITY COUNCIL of the CITY OF HUNTINGTON BEACH, CALIFORNIA, the 21st day of May 2024, by Resolution No. 24-349.
Bid Results
Sidewalks / Parking Lot
$1,684,111.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
June 23, 2025
17th St, Newport Beach, CA
Related To This Project
Newport Beach, CA
--
Newport Beach, CA
Bid Date: May 20 2025
Newport Beach, CA
Bid Date: Jun 05 2025
Newport Beach, CA
Bid Date: May 28 2025
Newport Beach, CA
--
Newport Beach, CA
Bid Date: Jun 05 2025
Newport Beach, CA
Bid Date: Jul 03 2025
Newport Beach, CA
Bid Date: Jul 10 2025
Newport Beach, CA
Bid Date: May 20 2025
Newport Beach, CA
--
Newport Beach, CA
--
Newport Beach, CA
Bid Date: May 05 2025
Newport Beach, CA
--
Newport Beach, CA
--
Newport Beach, CA
Bid Date: Apr 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.