BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work for a power facility in San Francisco, California. Working plans call for site work for a power facility.

Work may include site grading, increase in conductor tensions, installation of floating dead-end suspension assemblies, tower structure raises, tower replacement, interest mid-span tower structures, or one or more combinations of the methods, or implementation of other solutions. The City and County of San Francisco (the "City"), acting by and through the San Francisco Public Utilities Commission ("SFPUC"), is soliciting Proposals from qualified firms, teams, or joint ventures (JV), or other qualified business entities ("Proposers") to provide Design-Build services for Contract: DB-139, Transmission Line Clearance Mitigation Moderate and Low Risk (the "Project"). Please be advised that prior to receiving these materials, all requestors will be required to complete, sign, and comply with a Confidentiality Agreement. Question Deadline 06/02/2025 at 2:00 PM PT Written questions regarding the RFQ&P shall be directed to qbd@sfwater.org . Each Proposer must have a Class "A" or "C-10" California Contractor's license which is current, active, and in good standing with the California Contractors State License Board (CSLB), on the date and time the Minimum Qualifications Application (MQA) is submitted and must submit this MQA with all portions completed, including required attachments. The "Proposer's Team" is comprised of any combination of a Design-Builder, Lead Design Firm, Engineer(s), joint venture, subconsultants, subcontractors, and Key Team Members/Personnel. Unless expressly stated otherwise, experience and qualifications must be evaluated based on the combined experience and qualifications of the Proposer's Team. The terms "Design-Builder", "DB", "Prime Builder", and "Contractor" are used interchangeably throughout this RFQ&P in reference to the Proposer selected by the SFPUC that enters into an agreement to perform the Work of this Project.

Final Planning

Power Plant

$42,500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

43

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
11
Bidding Soon
1,885
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2025

October 17, 2025

Project location map

To Be Determined, San Francisco, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.