Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 30, 2025 at 8:00 PM
Updated July 1, 2025
Renovation of an educational facility in Benton Harbor, Michigan. Completed plans call for the renovation of a educational facility; and 18,000-square-foot educational facility.
**As of June 30, 2025, the project was awarded to Dekievers Roofing but the awarded amount is not available.** Benton Harbor Area Schools (hereinafter referred to as "Owner") is seeking proposals from qualified and experienced roofing contractors (hereinafter referred to as "Bidder" or "Contractor") for the complete replacement of the existing roof on the gymnasium at Benton Harbor High School. The project scope includes, but is not limited to, the removal and disposal of the existing roofing system, installation of a new roofing system, and all associated work as detailed in this RFP, The project scope encompasses the furnishing of all labor, materials, equipment, and supervision necessary for the complete replacement of the existing gymnasium roof at Benton Harbor High School. The approximate roof area is 18,000 sq ft. The work includes, but is not limited to: Removal and Disposal: Complete removal and lawful disposal of the existing roofing system, including all layers of roofing material, insulation, flashing, and any other related debris. Disposal must comply with all applicable local, state, and federal regulations. Roof Deck Inspection: Inspection of the existing roof deck for any damage or deterioration. The proposal should include pricing for addressing potential deck repairs, although this work will be authorized separately. New Roofing System: Installation of a new PVC or TPO roofing system, including all necessary underlayment, insulation, flashing, edge metal, and accessories. The proposed system must meet or exceed all applicable building codes and manufacturer's specifications. Provide detailed specifications of the proposed roofing materials, including manufacturer, product name, and warranty information. Warranty: Provide a comprehensive warranty for both materials and workmanship. Specify the length of the warranty period. A minimum 15 year warranty is preferred. Clean Up: Thorough cleanup of the work area, including removal of all debris and excess materials. Permits: Obtaining all necessary permits and inspections required for the project. Bid Bond Requirements A bid bond in the amount of 5% of the total bid price is required. The bid bond must be issued by a surety company authorized to do business in the State of Michigan. The bid bond must be submitted with the bid proposal. Failure to provide a bid bond will result in disqualification of the bid. All questions and requests for clarification regarding this RFP must be submitted in writing to the Contact Person: Bud Dash Director of Facilities, 269-605-1112, bud.dash@bhas.org All questions and requests for clarification regarding this RFP must be submitted in writing to the Contact Person listed above no later than May 23 2025. Responses will be provided in writing to all bidders. The Owner reserves the right to reject any and all proposals received in response to this RFP, to waive any irregularities or informalities in the proposals, and to award the contract to the bidder deemed to be in the best interest of the Owner. This RFP constitutes an invitation for proposals and does not constitute a binding contract. A contract will be awarded to the successful bidder only after negotiations and agreement on all terms and conditions
Award
Educational
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2025
July 7, 2025
870 Colfax Ave, Benton Harbor, MI
Related To This Project
Benton Harbor, MI
Bid Date: Jun 20 2025
Benton Harbor, MI
Bid Date: Jun 20 2025
Benton Harbor, MI
Bid Date: Jun 06 2025
Benton Harbor, MI
Bid Date: Jun 05 2025
Benton Harbor, MI
Bid Date: Jul 02 2025
Benton Harbor, MI
--
Benton Harbor, MI
Bid Date: Jul 02 2025
Benton Harbor, MI
Bid Date: Jan 07 2026
Benton Harbor, MI
Bid Date: Aug 14 2019
Benton Harbor, MI
Bid Date: Apr 02 2025
Benton Harbor, MI
Bid Date: Feb 14 2025
Benton Harbor, MI
--
Benton Harbor, MI
--
Benton Harbor, MI
--
Benton Harbor, MI
Bid Date: Jan 23 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
