Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated April 30, 2025
Renovation of a municipal facility in Reynoldsburg, Ohio. Conceptual plans call for the renovation of a municipal facility.
"Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer holding a certificate issued under section 4733.14 of the Revised Code." (Ohio Building Code section 4101:1-2-01 Definitions). Submit all questions regarding this RFQ in writing to Jill Hoobler at procurement@ofcc.ohio.gov with the project number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website. This project will construct a Shared Campus Entrance between the existing Fire Marshall Complex and the existing Ohio Department of Agriculture (ODA) Campus with a new traffic light, new directional signals, and modified turn lanes on U.S. Route 40. This will require input from stakeholders including ODA, the State Fire Marshal Training Academy staff and the City of Reynoldsburg. The goals of the design include safety for both employees and visitors, creating a grand entry for both State Departments, Site Security with a new guard shack to control entry to both respective agency sites, and to eliminate other entries into each agency site as determined necessary. The exact location of the shared entry drive will need to be determined during the programming phase. Particular attention will be needed as it relates to different vehicular traffic entering and exiting the site. Specifically, it will include emergency responder equipment, public vehicles, large delivery trucks, biohazard containment delivery vehicles and box trucks. Also to be considered will be future master planning for the ODA and the State Fire Marshall site, the required vehicle stacking distance at this new shared entry, the construction schedule timelines for a new traffic light with directional signals on U.S. 40 at this new shared entry, and the impact of this new entry related to paving, both on site and the anticipated modifications to U.S. 40. Site storm water design and retention will be a part of the planning factors to be included. Unifying card and badge reader systems will be a part of the planning criteria to be included. The number of controlled access gates will be a part of the planning criteria to be considered. Upon award of the Agreement, commence by developing the Program of Requirements. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program of Requirements, Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.
Conceptual
Municipal
$5,883,510.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2025
8995 E Main St, Reynoldsburg, OH
Related To This Project
Reynoldsburg, OH
Bid Date: May 08 2025
Reynoldsburg, OH
Bid Date: Sep 25 2025
Reynoldsburg, OH
Bid Date: Sep 12 2025
Reynoldsburg, OH
Bid Date: Sep 05 2025
Reynoldsburg, OH
--
Reynoldsburg, OH
--
Reynoldsburg, OH
Bid Date: Oct 13 2025
Reynoldsburg, OH
Bid Date: Nov 19 2025
Reynoldsburg, OH
Bid Date: May 28 2025
Reynoldsburg, OH
--
Reynoldsburg, OH
--
Reynoldsburg, OH
Bid Date: Apr 30 2025
Reynoldsburg, OH
Bid Date: Aug 10 2021
Reynoldsburg, OH
--
Reynoldsburg, OH
Bid Date: Feb 27 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
