Renovation of an educational facility in Los Angeles, California. Completed plans call for the renovation of a educational facility.

LOS ANGELES COMMUNITY COLLEGE DISTRICT Task Order Request for Bids Under Multiple Award Task Order Contract for Construction Services At Los Angeles Trade Technical College (LATTC) 400 W Washington Blvd, Los Angeles, CA 90015 Replacement of Electrical Switchboard Building C4 Procurement Number: PQ-25-FPD-03-T PROVIDE UPGRADED ELECTRICAL SWITCHBOARD, TRANSFORMERS, MEDIUM VOLTAGE SWITCHES AND UNIT SUBSTATIONS FOR THE FOLLOWING BUILDINGS: 1.3 (E) Bldg. 'C4' - APPLIED SCIENCE A# 03-113116 2. THE WORK INCLUDES THE REPLACEMENT OF ELECTRICAL EQUIPMENT, TEMPORARY POWER (PORTABLE GENERATOR) AND ASSOCIATED UNDERGROUND MEDIUM VOLTAGE FEEDERS. THE WORK INCLUDES THE REMOVAL, TRANSPORTATION, AND DISPOSAL OF EXISTING EQUIPMENT. 3. ALL EXISTING BRANCH PANEL EQUIPMENT AND ASSOCIATED LOADS SHALL REMAIN AND RECONNECTED TO THE NEW EQUIPMENT PROVIDE UPGRADED ELECTRICAL SWITCHBOARD, TRANSFORMERS, MEDIUM VOLTAGE SWITCHES AND UNIT SUBSTATIONS FOR THE FOLLOWING BUILDINGS: 1.3 (E) Bldg. 'C4' - APPLIED SCIENCE A# 03-113116 THE WORK INCLUDES THE REPLACEMENT OF ELECTRICAL EQUIPMENT, TEMPORARY POWER (PORTABLE GENERATOR) AND ASSOCIATED UNDERGROUND MEDIUM VOLTAGE FEEDERS. THE WORK INCLUDES THE REMOVAL, TRANSPORTATION, AND DISPOSAL OF EXISTING EQUIPMENT. ALL EXISTING BRANCH PANEL EQUIPMENT AND ASSOCIATED LOADS SHALL REMAIN AND RECONNECTED TO THE NEW EQUIPMENT. Upon successful completion of the work the following warranties will be provided to the LACCD. 1. Manufacturer Warranty for materials incorporated into the Scope of Work Long Order Lead Time for procurement up to Three Hundred Sixty-Four (364) Days. The Task Order Time for the Contractor to achieve Substantial Completion of the Work is One Hundred Eighty (180) Days (including delivery of parts). Final Completion must be achieved Two Hundred Eighty (280) Days after actual Substantial Completion. Liquidated Damages To District: $500.00 per day To Contractor: $0.00 per day Before the performance of any Construction Services for the Project, the Contractor shall be required to submit one (1) Payment Bond in the amount of no less than 100% of the entire Task Order Sum Payable (See Exhibit 16 for a sample). The Payment Bond is only required if the Base Bid Amount (exclusive of any District Controlled Allowances included in this Project) exceeds $25,000. Before the performance of any Construction Services for the Project, the Contractor will be required to submit one (1) Performance Bond in the amount of no less than 100% of the entire Task Order Sum Payable (See Exhibit 17 for a sample). The Performance Bond is only required if the Base Bid Amount (exclusive of any District Controlled Allowances included in this Project) exceeds $25,000.

Post-Bid

Educational

$500,000.00

Public - County

Renovation

23

16

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
662
Active Projects
308
Bidding Soon
3,332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

June 9, 2025

Project location map

401 W Washington Blvd, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.