BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 28, 2025 at 8:00 PM

Updated April 29, 2025

Site work and paving for a mixed-use development in Nashville, Tennessee. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of April 28, 2025, an engineer has been selected and this project in the design phase. It is anticipated bidding will 1st Quarter 2027, with construction starting in 2027 or 2028. Nashville Department of Transportation is coordinating with the Tennessee Department of Transportation (TDOT) to construct an 10-foot sidewalk, 4-foot furnishing zone, and curb/gutter along the south side of Harding Place from Danby Drive to Nolensville Pike. Pedestrian enhancements will include ADA ramps, markings, and signals. This project will extend and connect the existing sidewalk infrastructure constructed in Phase 1 (Timber Hill Drive to Danby Drive) and Phase 2 (Nolensville Pike to I-24), which will extend the pedestrian path from I-65 to I-24 on the south side of Harding Place when completed.

Design

Sidewalks / Parking Lot

$6,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

Gallatin Pike, Nashville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.