BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Site work for a water / sewer project in Cincinnati, Ohio. Completed plans call for site work for a water / sewer project.

Turnkey purchase, removal and installation of two (2) complete packages to replace existing gear boxes in the Mill Creek facility that consists of: three (3) new Nord gear boxes, four (4) Brunel torque limiters, four (4) Allen Bradley limit switches, four (4) Chain drive take up assemblies and three (3) Stainless Steel mounting plates with brackets. This bid is to also include the removal and salvage of existing units for later use. Gear Box Replacement for Primary Output at Mill Creek WWTP (10280725) Deadline 06/4/2025 at 12:00 PM ET Bid Bond Yes, 10% Small Business Enterprises, including those registered with the City of Cincinnati Office of Contract Compliance Small Business Enterprise Program, are encouraged to respond to this solicitation. COMPLETION OF WORK The work shall meet Final Completion within 60 calendar of the Date of Commencement as identified in the Notice to Proceed, unless approved in writing by MSDGC. LIQUIDATED DAMAGES The amount of liquidated damages to be paid by the contractor for each and every calendar day that is in default shall be determined on a per-project basis and shall be based on ODOT Specifications, Section 108.07. Project Description 1.0 General Description 1.01 Summary of work 1.01.1 Turnkey purchase, removal and installation of two (2) complete packages to replace existing gearmotors in the Mill Creek facility that consists of: three (3) new gearmotors, five (5) torque limiters, five (5) limit switches, four (4) Chain drive take up assemblies, and three (3) Stainless Steel mounting plates with brackets. This bid is to also include the removal and salvage of existing units for later use. All supplied equipment shall be compatible with Polychem NH-78 Chain (see attached Specs) and include a minimum 1- year manufacturer's warranty on material and craftsmanship. 2.0 Equipment Performance 2.01 Gearmotors, qty three (3) - shall be a 75 HP, hollow bore, with 304 stainless steel hardware. - All hardware shall be stainless steel. - All painted surfaces shall be coated with coatings suitable for harsh environments. - Coating submittals shall be submitted for MSD's approval. - All shall be rated for outdoor installation. o NEMA 4x or IP65. 2.02 Torque limiters, five (5) Torque limiters in the packaged solution to meet the following specifications: - Max bore 3". - Torque Range 1,500-13,000 lb-in. - An 11 Nylon Tooth Sprocket shall be included for each torque limiter in the package. 2.03 Limit Switch, five (5) limit switches per package: - NEMA type 4/13 oiltight construction. - lever rod, 2 circuit switch, maintained. - stainless steel lever rod shall be 11.5 inch and made of 304 stainless.

Bid Results

Water / Sewer

$121,750.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
32
Bidding Soon
2,066
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

July 11, 2025

Project location map

1600 Gest St, Cincinnati, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.