Published June 2, 2025 at 8:00 PM
Updated June 3, 2025
Site work and paving for a sidewalk / parking lot in Palatka, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The St. Johns River Water Management District ("District") desires to procure a contractor to sealcoat and restripe the Tom Lawton parking lot. The parking lot is roughly 500-feet long by 220-feet wide with six tree islands located within the parking area. Further information as outlined in the Statement of Work. There is no scheduled site visits planned for this project; however, it is recommended that you contact the District Project Manager to schedule a site visit. You may contact Harman Bansil District's Project Manager at 321-978-1917 or via email at hbansil@sjrwmd.com to schedule a site visit. Please provide at least a 24-hour notice to schedule. If you need assistance or have any questions about submitting your quote, please email Breanna Pierce at BPierce@sjrwmd.com or call (386) 643-1168. Every request for a written interpretation or correction must be received at least nine days prior to opening of quotes in order to be considered. Requests must be submitted by email to BPierce@sjrwmd.com. Interpretations, corrections, and supplemental instructions will be communicated by written addenda to this solicitation SCOPE Contractor's Responsibilities o Coordinate construction date(s) with District staff a minimum of one-week ahead of construction commencement. At this time, provide the District's Project Manager with product data sheets for both the asphalt crack filler material and coal tar pavement sealer including recommended application rates. Pavement sealer shall meet ASTM D5727 composition and performance standards. o Conduct a preconstruction meeting with District operations staff prior to commencing construction. o Mobilize to site and provide all labor, equipment and material to complete the project. o Both surface and ambient temperature must be a minimum of 50F and rising before applying cold applied crack fillers, oil spot primers, pavement sealers or traffic paints (materials). Ambient and surface temperature shall not drop below 50F for a 24-hour period following application of materials. Application should not commence until it is determined there is no standing water to prevent an even application and drying of the asphalt sealer. Apply materials during dry conditions when rain is not imminent or forecast for at least 24 hours after application. o Prior to any asphalt work, the entire asphalt surface shall be thoroughly cleaned of all loose debris. District staff to approve surface prior to sealcoating. o Clean light oil deposits and pretreat with a primer. Oil spots should be flash burned and primed. o Cracks of approximately 1/4 to 3/4 inches wide shall be cleared of debris and filled with an approved crack sealant in accordance with manufacturer's product specifications. o Apply two coats of the pavement sealer per the manufacturer's recommendation. The first coat shall be squeegeed. The second coat can be sprayed. o If necessary, ribbon off freshly sealed areas for overnight drying. o Restripe Parking Lot (FDOT Section 710 and 971) in same configuration as currently exists or as directed by the Project Manager. This includes parking stalls (6-inch width), ADA parking stalls and directional arrows. o Demobilize from site. The Contractor shall take care to protect all existing structures, roads, utilities and other improvements from damage. Additionally, the Work will be considered complete only after all rubbish and unused material connected with the Work has been removed and the premises of the Work shall be restored to its former condition or better at no additional expense to the District. District's Responsibilities o Provide access to contractor. o Participate in preconstruction meeting. o Secure parking lot from the public during construction o Review and approve product data sheets and application rates o Oversee all aspects of the construction. o Conduct final walk-through with Contractor The completion date for all work is June 30, 2025.
Award
Sidewalks / Parking Lot
$25,500.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2025
June 19, 2025
To Be Determined, Palatka, FL
Related To This Project
Palatka, FL
Bid Date: Apr 21 2025
Palatka, FL
Bid Date: May 27 2025
Palatka, FL
--
Palatka, FL
Bid Date: Jun 07 2025
Palatka, FL
Bid Date: Jul 01 2025
Palatka, FL
Bid Date: Jul 01 2025
Black Creek Water Resource Development Project Pipeline Route Underground Locating Service - 5809836
Palatka, FL
Bid Date: Jun 18 2025
Palatka, FL
Bid Date: Apr 30 2025
Palatka, FL
Bid Date: May 08 2025
Palatka, FL
Bid Date: Jun 11 2025
Palatka, FL
Bid Date: May 20 2025
Palatka, FL
Bid Date: May 06 2025
Palatka, FL
Bid Date: May 08 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.