Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 19, 2025 at 8:00 PM
Updated June 20, 2025
Site work for a mixed-use development in Arlington, Massachusetts. Completed plans call for site work for a water / sewer project.
The ARLINGTON HOUSING AUTHORITY, the Awarding Authority, invites sealed bids from Contractors for the Ejector Pump Relocation & Replacement and sump pump system evaluation at State Aided Development: Chestnut Manor (667-2) in Arlington, Massachusetts The Project consists of but not limited to: Remove existing ejector station and install new gravity sewer line in Chestnut Terrace. Removal of existing sump pumps and installation of new pumps. Question Deadline 05/16/2025 at 11:00 AM ET All bidding Requests for Information (RFIs) shall be submitted electronically. Bids are subject to M.G.L. c.30 39M and to minimum wage rates as required by M.G.L. c.149 26 to 27H inclusive. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates) and made payable to the ARLINGTON HOUSING AUTHORITY. Note: A bid deposit is not required for Projects advertised under $50,000. The Contractor and all subcontractors (collectively referred to as "the Contractor") agree to strive to achieve minority and women workforce participation. The Workforce Participation benchmark is set at 6.9% for women and 15.3% for minorities. The Workforce benchmark percentages are a statutory requirement under MGL c. 149 44A(2)(G).
Award
Water / Sewer
$331,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2025
June 23, 2025
54 Medford St, Arlington, MA
Related To This Project
Arlington, MA
Bid Date: May 06 2025
Arlington, MA
--
Arlington, MA
Bid Date: May 28 2025
Arlington, MA
Bid Date: Feb 05 2026
Arlington, MA
Bid Date: Jun 12 2025
Arlington, MA
Bid Date: Jun 12 2025
Arlington, MA
Bid Date: Jun 12 2025
Arlington, MA
Bid Date: Jul 03 2025
Arlington, MA
Bid Date: May 28 2025
Arlington, MA
--
Arlington, MA
Bid Date: May 01 2025
Arlington, MA
Bid Date: Apr 17 2025
Arlington, MA
Bid Date: Apr 17 2025
Arlington, MA
--
Arlington, MA
Bid Date: Mar 26 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed