BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Site work and paving for a mixed-use development in Creston, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Creston Drainage 2025 Project Proposals are now being accepted for the Creston Drainage 2025 Project for storm sewer installation and replacement through a drainage easement across private properties. Improvements include proposed storm structures, storm sewer installation, parkway grading, pavement restoration and site restoration. Each proposal must be accompanied by the Contractor's Certificate of Eligibility, a certified check, cashiers check, or bid bond, payable to the Village of Creston for the amount not less than five percent (5%) of the total amount of the proposal The Contractor's Prequalification Categories must be relevant to the majority of work to be performed. All bidders shall note the following: (1) construction monies will be drawn from local funds on hand: (2) the successful contractor will be paid on a monthly basis according to the approved estimate of completed work: (3) the Village strongly urges all contractors to employ the use of local subcontractors, suppliers, and trades as much as possible for this contract. Labor rates shall be in accordance with the General Prevailing Rate of Wages for the Village of Creston, Ogle County, Illinois, and which are on file in the Office of the Department of Labor, Springfield, Illinois The Village reserves the right to reject any or all bids on each proposal, and to waive any information there in or to accept any proposal considered in the best interest of the Village . No bid shall be withdrawn after the opening of bids without written consent of the Village of Creston for a period of forty five (45) days after the scheduled time of closing of bids.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
258
Bidding Soon
3,554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

June 9, 2025

Project location map

Multiple Locations, Creston, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.